Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
All,
As noted during yesterday’s meeting, I noted that given rules changes related to the life of a study group, it was necessary to request the extension of the study group, rather than just its rechartering. As part of the motion that needs to be presented to the EC on Friday – a rational has to be provided for the extension request.
As this is the first time doing this particular motion, I inadvertently forgot to show the proposed text to the Study Group yesterday. Here is the draft text I will propose to the WG at today’s closing plenary in support of the SG extension –
Rational for the extension: Approval has been sought to forward the IEEE P802.3cn PAR to NesCom which was developed by this Study Group. This request for extension is for two reasons: (a) to be able to address any issues during the approval process for the IEEE P802.3cn PAR; and (b) to allow the Study Group to meet during the IEEE 802.3 September interim week for further study and consensus building. The IEEE-SA Standards Board won't meet to consider the NesCom recommendation on IEEE P802.3cn PAR until 27th September, after the interim week.
My apologies for not showing this text yesterday. I didn’t want to surprise members of the Study Group later today, so I am sending to the reflector now.
Regards,
John D’Ambrosia
Chair, IEEE 802.3 Beyond 10km Optical PHYs Study Group
To unsubscribe from the STDS-802-3-B10K list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-B10K&A=1