All Files 02-Sept-2021 (6.4M) |
||
Agenda and General Information 26-Aug-2021 (528k) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Unapproved Minutes 02-Sept-2021 (246k) |
Tom Issenhuth John D'Ambrosia |
Huawei Futurewei, U.S. Subsidiary of Huawei |
Motions & Strawpolls 27-Aug-2021 (137k) |
||
Liaisons & Communications |
||
Presentations - 12 August 2021 |
||
Technical feasibility of the "10km @ 800Gb/s" objective 10-Aug-2021 (1.4M) |
Tingting Zhang Sen Zhang Yan Zhuang |
Huawei |
Support for 800GbE over 8lanes (8x100G) Copper Cables 12-Aug-2021 (216k) |
Samuel Kocsis | Amphenol |
Presentations - 19 August 2021 |
||
Feasibility of 800G LR4 and 800G
ER8 with PAM4 IMDD 19-Aug-2021 (1.1M) |
Rang-Chen Yu Frank Chang |
SiFotonics Source Photonics |
Draft Project Documentation 17-Aug-2021 (526k) |
John D'Ambrosia Gary Nicholl Mark Nowell David Ofelt George Zimmerman |
Futurewei, U.S. Subsidiary of
Huawei Cisco Cisco Juniper CME Consulting |
Study Group Discussion of
Draft Project Discussion (Work in progress- not adopted) 19-Aug-2021 (526k) |
||
Presentations - 26 August 2021 |
||
Further
Consideration on 200G per lane KR/CR electrical links 26-Aug-2021 (1.2M) |
Yuchun Lu Cuicui Wang Shan Cao Yan Zhuang |
Huawei |
Addressing
possible 800G copper cable objective 25-Aug-2021 (189k) |
Adee Ran | Cisco |
Broadened Consensus for a
200GEL Copper Cable Objective 26-Aug-2021 (1.8M) |
Samuel Kocsis Nathan Tracy |
Amphenol TE Connectivity |
IEEE 802.3 Beyond 400 Gb/s Ethernet Study Group Home Page
Last Update: 02 Sept 2021