All Files 28-Sept-2021 (2.1M) |
||
Agenda and General Information 02-Sept-2021 (533k) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Approved Minutes 01-Nov-2021 (212k) |
Tom Issenhuth John D'Ambrosia |
Huawei Futurewei, U.S. Subsidiary of Huawei |
Motions & Strawpolls 28-Sept-2021 (56k) |
||
Liaisons & Communications |
||
IOWN GF to IEEE 802.3 introducing the Innovative Optical and
Wireless Network Global Forum (IOWN GF) Attachment (Password protected) |
||
ITU-T SG15 to IEEE 802.3: OTN support of Ethernet clients beyond 400 Gb/s (reply to IEEE 802-LS1) | ||
OIF to IEEE 802.3 on the progress on 800G Coherent Project Status Attachment (Password protected) |
||
Presentations - 02 Sept 2021 |
||
Project documentation for
802.3df – timeline considerations 02-Sept-2021 (939k) |
Mark Nowell John D'Ambrosia |
Cisco Futurewei, U.S. Subsidiary of Huawei |
Draft Project Documentation
Update 01-Sept-2021 (470k) Update per Study Group Discussion |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Presentations - 09 Sept 2021 |
||
Feasibility study of coherent 800Gb/s
for 10km & 40km 09-Sept-2021 (465k) |
Huijian Zhang Qiang Zheng Haoran Cheng Xinyuan Wang Limin Geng |
Hisilicon
Optoelectronics Hisilicon Optoelectronics Hisilicon Optoelectronics Huawei Technologies Huawei Technologies |
Draft Project PAR 03-Sept-2021 (43k) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Draft Project CSD 03-Sept-2021 (130k) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Presentations - 28 Sept 2021 (Sept 2021 Interim Meeting) |
||
Proposed Draft Response to
IOWN Liaison 21-Sept-2021 (214k) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
IEEE 802.3 Beyond 400 Gb/s Ethernet Study Group Home Page
Last Update: 18 Oct 2021