Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_EXTND_EPON] IEEE P802.3bk Extended Ethernet Passive Optical Networks (EPON) 1st Working Group ballot results



Dear Colleagues:

The IEEE 802.3 Working Group 1st recirculations ballot on the amendment IEEE
P802.3bk Extended Ethernet Passive Optical Networks (EPON) closed
successfully on Monday 25th February 2013 23:59 AOE. The ballot exceeded the
required 75% for consensus to approve the draft. The March 2013 IEEE
P802.3bk Task Force plenary week meeting
(http://www.ieee802.org/3/interims/index.html) will consider the 22 comments
submitted and determine changes to the draft as appropriate. The
availability of the comment database will be announced on the IEEE P802.3bk
Task Force reflector.

The ballot statistics are:

	232	Voters
	99 	Approve
	0 	Disapprove
	29 	Abstain
	128	Ballots returned

	55.17%	Response Rate (>= 50% required)
	22.66%	Abstain Rate (< 30% required)
	100%	Approval Rate (>= 75% required)

Thank you to all that participated in this ballot. 

All the comments received in this ballot were uploaded to the Task Force
website: http://www.ieee802.org/3/bk/comments/8023bk_D21_received.pdf. The
proposed responses should be expected within the next week. 

David Law
Chair, IEEE 802.3 Ethernet Working Group

Marek Hajduczenia
Chair, IEEE P802.3bk Extended Ethernet Passive Optical Networks (EPON) Task
Force