Organizational materials |
|
All contributions (zipped, version 4) |
15.3MB |
Marek Hajduczenia |
ZTE Corporation |
|
Opening SG report |
1.8MB |
Marek Hajduczenia |
ZTE Corporation |
|
Opening WG report |
428kB |
Marek Hajduczenia |
ZTE Corporation |
|
Closing WG report |
1.05MB |
Marek Hajduczenia |
ZTE Corporation |
|
Meeting minutes (unapproved) |
103kB |
Alan Brown |
Aurora Networks |
|
Meeting minutes (approved 2012.01.27) |
103kB |
Alan Brown |
Aurora Networks |
|
Approved project objectives |
353kB |
ExEPON Study Group |
|
|
Approved project PAR |
179kB |
ExEPON Study Group |
|
|
Approved 5 Criteria for the project |
507kB |
ExEPON Study Group |
|
|
Closing motions for PAR, SG extension and editorial license for the Chair |
196kB |
ExEPON Study Group |
|
Technical contributions |
|
Title |
Size |
Author(s) |
Affiliation |
|
Cost Comparison of the 10G-EPON PMDs |
170kB |
David Li |
Hisense-Ligent |
|
Target Specifications of Extended 10G-EPON PMDs |
152kB |
David Li |
Hisense-Ligent |
|
Proposal for Extended EPON PMD |
2.3MB |
Jidong Xu |
ZTE Corporation |
PAR & 5 Criteria ontributions |
|
Title |
Size |
Author(s) |
Affiliation |
|
5 Criteria: Distinct Identity |
290kB |
Marek Hajduczenia |
ZTE Corporation |
|
5 Criteria: Market Potential |
1.6MB |
Ed Mallette |
BrightHouse Networks |
|
5 Criteria: Technical Feasibility |
243kB |
David Li |
Hisense-Ligent |
|
5 Criteria: Economic Feasibility |
243kB |
David Piehler |
Neophotonics |
|
5 Criteria: Compatibility |
465kB |
Marek Hajduczenia |
ZTE Corporation |
|
Proposed objectives for the project |
210kB |
Marek Hajduczenia |
ZTE Corporation |
|
Proposed responses to PAR questions |
728kB |
Marek Hajduczenia |
ZTE Corporation |
Technical contributions (post-deadline, from the floor) |
|
Title |
Size |
Author(s) |
Affiliation |
|
10G EDC For Extended Reach in SMF: Both Down- & Up-stream |
642kB |
Frank ChangDavid Li |
VitesseHisense-Ligent |
|
project objectives ... how far, how long ... |
797kB |
Marek Hajduczenia |
ZTE Corporation |
|
Notes on EPON extender boxes and EPON PMDs |
1.7MB |
David Piehler |
Neophotonics |
|
5 Criteria: Market Potential (revision a) |
1.2MB |
Ed Mallette |
BrightHouse Networks |
|
Proposal for Extended EPON PMD(revision with technical changes) |
2.3MB |
Jidong Xu |
ZTE Corporation |