Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Colleagues,
Subject: 40GBASE-T cabling channel July 12 minutes; next meeting August 9 webex to follow.
July 12 attendance:
Minutes from last meeting were approved. Agenda was approved. Port Mapping: Agreements: Use version 1 Touchstone files to transfer data. Use 1 MHz step size Start at 1 MHz Stop at 2000 MHz or higher Use
the port mapping in figure 5 from Modeling: Agreed that the modeling (from contributions made at previous meetings) shows that 0.5 m patch cords can be supported with the 2 dB enhanced return loss limit i.e., a 0.5 meter patch cords can be supported with a 2 dB (1 GHz-2GHz) improvement in Category 8 RL (D0.7) channel limits. Agreed that shorter patch cords can be used, if they have the same insertion loss as 0.5 m patch cord (e.g., 0.5m 26 AWG stranded - IL TBD). Next meeting August 9.
In a message dated 7/11/2013 8:44:25 A.M. Eastern Daylight Time,
CDimi80749@xxxxxxx writes:
|