Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
·
9-10am – informal consensus building time for two cross-TF issues: 1) Clamp; 2) Bit allocation (see comment 130). Meet in Calusa A. ·
10am – P802.3bq resumes ·
1pm – break for those who would like to hear the UL POE/NFPA webinar. Chad Jones will be projecting the webinar in the POE room.
http://www.cablinginstall.com/webcasts/2015/09/ul-the-nec-and-power-over-lan-cable.html ·
2pm P802.3bz starts Thanks, Dave |