Meeting Materials |
||
All Files |
||
General Information | ||
Agenda and General Information
|
Bill Woodruff | Broadcom |
Approved Minutes |
George Zimmerman |
CME Consulting / Commscope |
Liaisons and Communications | ||
Presentations |
Major PAR Form Questions 23-Sept 12 (87k) |
David Law | HP |
Project Objectives 21-Sept 12 (188k) |
Dan Dove | Applied Micro |
Review of the 5 Criteria 21-Sept 12 (232k) |
John D'Ambrosia | Dell |
ISO/IEC SC 25/WG 3 - an overview 21-Sept 12 (78k) |
Alan Flatman | LAN Technologies |
TIA TR42.7 Next
Generation Cabling Project Update 21-Sept 12 (28k) |
Valerie Maguire | Siemon |
Cabling Parameters 25-Sept 12 (343k) supporting materials (cable insertion loss vs. length calculator) 23-Sept-12 (2.5MB) |
Wayne Larsen | Commscope |
Length Distribution 21-Sept 12 (176k) |
Wayne Larsen | Commscope |
Preliminary Study: Modeled
40G Reach on category cabling 21-Sept 12 (1569k) |
Paul Vanderlaan | Nexans |
Cabling Challenges and Opportunities 24-Sept 12 (291k) |
Ron Nordin Bob Wagner |
Panduit Panduit |
NGBASE-T Link Segments 21-Sept 12 (292k) |
Chris DiMinico | MC Communications |
Server NIC
Market Update from CFI 23-Sept 12 (672k) |
David Chalupsky | Intel |
Considerations for Objectives in
Next-Gen BASE-T 21-Sept 12 (140k) |
George Zimmerman | CME Consulting / Commscope |
An
Overview of Energy-Efficient Ethernet 25-Sept 12 (26k) |
Mike Bennett Wael Diab |
LBNL Broadcom |
NGBASE-T Considerations: Reach and Migration Path 23-Sept 12 (378k) |
Brad Booth David Koenen |
Dell HP |
NGBASE-TSR - A Scalable BASE-T Approach 25-Sept 12 (1142k) |
Dan Dove | Applied Micro |
Thoughts on Rate Objective 25-Sept 12 (328k) |
John D'Ambrosia Wael Diab |
Dell Broadcom |
Next Generation BASE-T: a Simple model of Relative Power Cost vs. Reach 25-Sept 12 (384k) |
Will Bliss | Broadcom |
Proposed objectives for Next-Gen BASE-T 21-Sept 12 (79k) as updated during the meeting: Proposed objectives for Next-Gen BASE-T 2-Oct 12 (82k) |
George Zimmerman | CME Consulting / Commscope |
Drafting the 5 Criteria 25-Sept-12 (167k) |
David Chalupsky | Intel |
Filling in the PAR 25-Sept 12 (25k) as updated during the meeting: Filling in the PAR 2-Oct 12 (26k) Filling in the PAR Part Deux 2-Oct 12 (13k) |
Wael Diab | Broadcom |
Presentations Received During the Meeting | ||
Major factor for an Objective: LENGTH 25-Sept-12 (52k) |
Geoff Thompson | GraCaSI |
Return to Next Generation BASE-T Study Group Public Area
Last Update: 02-Octiber-2012