Next Generation BASE-T Study Group

Interim Meeting Material
Sept 24 - 25, 2012
Geneva, CH

 

Meeting Materials

All Files
     4-Oct 12 (10MB)

General Information

Agenda and General Information
     23-Sept 12 (536k)

Bill Woodruff Broadcom

Approved Minutes
     20-Nov 12 (310k)

George Zimmerman CME Consulting / Commscope
Liaisons and Communications
Presentations
Major PAR Form Questions
23-Sept 12 (87k)
David Law HP
Project Objectives
21-Sept 12 (188k)
Dan Dove Applied Micro
Review of the 5 Criteria
21-Sept 12 (232k)
John D'Ambrosia Dell
ISO/IEC SC 25/WG 3 - an overview
21-Sept 12 (78k)
Alan Flatman LAN Technologies
TIA TR42.7 Next Generation Cabling Project Update
21-Sept 12 (28k)
Valerie Maguire Siemon
Cabling Parameters
25-Sept 12 (343k)
         supporting materials
        (cable insertion loss vs. length calculator)
         23-Sept-12 (2.5MB)
Wayne Larsen Commscope
Length Distribution
21-Sept 12 (176k)
Wayne Larsen Commscope
Preliminary Study: Modeled 40G Reach on category cabling
21-Sept 12 (1569k)
Paul Vanderlaan Nexans
Cabling Challenges and Opportunities
24-Sept 12 (291k)
Ron Nordin
Bob Wagner
Panduit
Panduit
 NGBASE-T Link Segments
21-Sept 12 (292k)
Chris DiMinico MC Communications
Server NIC Market Update from CFI
23-Sept 12 (672k)
David Chalupsky Intel
Considerations for Objectives in Next-Gen BASE-T
21-Sept 12 (140k)
George Zimmerman CME Consulting / Commscope
An Overview of Energy-Efficient Ethernet
25-Sept 12 (26k)
Mike Bennett
Wael Diab
LBNL
Broadcom
NGBASE-T Considerations: Reach and Migration Path
23-Sept 12 (378k)
Brad Booth
David Koenen
Dell
HP
NGBASE-TSR - A Scalable BASE-T Approach
25-Sept 12 (1142k)
Dan Dove Applied Micro
Thoughts on Rate Objective
25-Sept 12 (328k)
John D'Ambrosia
Wael Diab
Dell
Broadcom
Next Generation BASE-T: a Simple model of Relative Power Cost vs. Reach
25-Sept 12 (384k)
Will Bliss Broadcom
Proposed objectives for Next-Gen BASE-T
21-Sept 12 (79k)
      as updated during the meeting:
       Proposed objectives for Next-Gen BASE-T
       2-Oct 12 (82k)
George Zimmerman CME Consulting / Commscope
Drafting the 5 Criteria
25-Sept-12 (167k)
David Chalupsky Intel
Filling in the PAR
25-Sept 12 (25k)
   as updated during the meeting:
    Filling in the PAR
    2-Oct 12 (26k)
    Filling in the PAR Part Deux
    2-Oct 12 (13k)
Wael Diab Broadcom
Presentations Received During the Meeting    
Major factor for an Objective: LENGTH
25-Sept-12 (52k)
Geoff Thompson GraCaSI



Return to Next Generation BASE-T Study Group Public Area
Last Update: 02-Octiber-2012


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]