Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Colleagues, It seems in my rush to escape the office and begin a tropical vacation, I was negligent with sending out meeting notes from our last consensus building meeting. Herewith please find the meeting notes from our meeting on 10/8/2015. Please
accept my apologies for this oversight. Of particular note, the deadline for submitting contributions for the upcoming November meeting is October 30! Please let me know if I need to add to or revise the meeting notes below. Curtis 10/08/2015 IEEE 802.3 NG-EPON Study Group Work Items and Socialization
·
Review of Guidelines for IEEE-SA meetings.
o
https://development.standards.ieee.org/myproject/Public/mytools/mob/preparslides.pdf
o
Has anyone not seen these Guidelines?
Everyone has seen the guidelines
·
November meeting
o
Study Group meeting times (tentative but likely):
§
Tuesday, 11/10, 1 pm – 5:30 pm
§
Wednesday, 11/11, 9 am – 5:30 pm
§
Thursday, 11/12, 9:00 am – 12:00 pm
·
CSD/PAR/Objectives timeline
·
Contribution deadline:
o
Contribution deadline: October 30, 2015 AOE
o
Send initial PDF and
indicate amount of time desired
to c.knittle@xxxxxxxxxxxxx
·
Finish scope discussion
o
Proposed scope change: The scope of this project is to amend IEEE Std 802.3 to add physical layer
specifications and management parameters for symmetric and/or asymmetric operation at 25 Gb/s, 50 Gb/s, and 100 Gb/s MAC data rates on point-to-multipoint passive
optical networks.
·
Comments on Objectives:
o
Do we need to add 50 Gb/s to the objectives? For example;
§
Provide specifications for physical layers operating over a single SMF strand and supporting
symmetric and/or asymmetric MAC data rates of:
·
25 Gb/s in downstream and
less than or equal to 25 Gb/s in upstream
·
50 Gb/s in downstream and less than or equal to 50 Gb/s in upstream
·
100 Gb/s in downstream and
less than or equal to100 Gb/s in upstream.
§
The above changes were the consensus of the meeting participants.
·
Initial plan for contributions (tentative)
o
Channel bonding
o
New material on 25 Gb/s serial
o
Updated contribution on layers
·
Open floor
o
Would be great to have an overview of NG-PON2 scheduling, and thoughts on potential flexible scheduling
Curtis Knittle Director, Optical Technologies CableLabs 858 Coal Creek Circle Louisville, CO 80027 Office: 303-661-3851 Mobile: 303-589-6869 Email:
c.knittle@xxxxxxxxxxxxx |