Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Colleagues, Please see the third contribution. Talk to you in few minutes. Thank you. Best regards, Mehmet From: Mehmet Tazebay
Dear Colleagues, This is a friendly reminder that we will have the EMC/Noise Ad Hoc Conference call tomorrow 10/18/2013 Friday at 8:30am PDT. There will be 3 contributions made
and please see two of those presentations attached. Thanks to the contributors for their effort. I look forward to speaking to you tomorrow. Best regards, Mehmet Ps. Please send me an email for your attendance to this conference call so I can record it. Thanks. From: Mehmet Tazebay
Dear Colleagues, This is a call for contributions for EMC/Noise Ad Hoc. I propose to have a conference call on 10/18/2013 Friday at 8:30am
PDT. The proposal for discussion topics are the following: 1.
Further measurements & confirmation for the balance of RTPGE components (cables, connectors, and etc.) and RTPGE link segment with 15m UTP + 4-inline
connectors 2.
Continuation of the discussion for the proposed mode conversion limit line (from 9/5/2013) for RTPGE link segment and consensus building 3.
Clarification for BCI limit lines in Automotive EMC system level testing 4.
Other open items (?) Please let me know ASAP if you plan to make a contribution or have other topics to discuss. Thank you for your participation. Best regards, Mehmet
|
Attachment:
20131017 RTPGE cable&link testing CMC v2.pdf
Description: 20131017 RTPGE cable&link testing CMC v2.pdf