Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
All – thank you for a productive and hard working 3 hour meeting today. I have posted the resolved comment reports in the comment area, as well as the updated agenda deck.
We will have our electronic interim on 9 July as we strive to be ready for initial WG ballot in July. This was announced as a contingent interim at the May meeting. The draft 1p1 will be turned after the 9 July meeting, so please consider the D1p1 plus the added content from comment resolution. Since the purpose of the 9 July meeting is to fill in the draft to technical completeness for presubmission to working group, please review and look for holes. My review suggests we need proposals for content especially for 190.5 (PMA Electricals and test modes), 190.8 MDI, and 190.10 Delay. Minor issues may be filled in at the plenary, but goal is to keep that to a minimum. Preferably put in tentative values marked with TBD that may be adjusted. Note comments on D1p1 resolved on 6/25 are found in
https://www.ieee802.org/3/dg/comments/index.html Thank you to all who have provided comments, review, and content for the draft – and a special thank you to Yan Zhuang and Valerie Maguire who have been working hard behind the scenes to convert diagrams and
implement comments into the draft. George A. Zimmerman, Ph.D. Chair, IEEE P802.3dg 100BASE-T1L Task Force 2nd Vice Chair, IEEE 802 LAN/MAN Standards Committee CME Consulting, Inc. 1-310-920-3860 To unsubscribe from the STDS-802-3-SPEP2P list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-SPEP2P&A=1 |