IEEE 802.3ae 10Gb/s Task Force
October 2001 Interim meeting

October 15-16, 2001
Los Angeles, CA

Meeting Minutes
Meeting Agenda
Chair's Introductory Remarks

File of all Presentations

all_files.tar.gz
3605K

Presentations

D3.2 Comment and Ballot Summary
36K

Brad Booth
Intel


Link Model Update
36K

Piers Dawe
Vipul Bhatt
Tom Lindsay

Agilent
Finisar
Stratos Lightwave


Interoperability Demonstration 10GBASE-S
157K

Jeff Bisberg
Cieloinc


PMD 1310 10GBASE-L Feasibility Report
582K

Vipul Bhatt
Kan Imai
Kinya Yamazaki

Finisar
Hitachi Cable
Hitachi Cable


10GBASE-LX4:Technical Feasibility
1465K

John Dallesasse
Eric Grann
Bor-Long Twu

Molex Fiber Optics
Blaze Network Products
Pine Photonics


10GBASE-S Technical Feasibility
671K

Dave Kabal
Jeff Bisberg

Picolight
Cielo


Optical Link Model that treats jitter and amplitude fluctuations jointly
115K

Dubravko Babic
Alvesta


Availability of optical units for 10 Gbit/s optical according to specification in D3.1
32K

Juergen Rahn
Lucent Technologies


Proposed Inclusion of Non-Zero Dispersion Shifted Fiber (IEC 60793-2 Type B4)
69K

Andy Woodfin
Corning


Multivendor Feasibility Trials of 1550nm 40km 10GbE PMD using an EA Transmitter and PIN Receiver
726K

Alan Tipper, Mark Lindsay
Richard Brand, Jean-Francois Tremblay
Juergen Rahn, Angel Molina
Robert Zona, Steve Buchheit

Nortel Networks
Nortel Networks
Lucent
Intel


The Customer Requirement for 10GBASE-LX4
51K

Bruce Tolley
Bob Grow
David Law

Cisco Systems
Intel
3Com


Report to IEEE 802.3ae of technology demonstration conducted by 10GEA at N+I
366K

Mark Fishburn
Spirentcom


Sponsor Ballot Group

IEEE P802.3ae Balloting Group Signup Status - 16 Oct 2001
27K


Return to 802.3ae Task Force public area
Last Update: 23 Nov 01


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]