Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[10GBASE-CX4] Revised Agenda




Hello all,

It turns out that I won't be able to upload the presentations
until I get home as my employer has a firewall that prevents
access to the IEEE ftp server.

In addition, I have revised the agenda to add a few very small
presentations on Tuesday AM, prior to our breakouts. 

I spoke to the hotel and everything is ready to go. I hope
your travel goes well and look forward to seeing you on 
Monday morning.

Best Regards,

Dan Dove
10GBASE-CX4 Coordinator
======================================
Principal Engineer, LAN PHY Technology
System Architect, Workgroup Switching
dan.dove@hp.com     
hp ProCurve Networking Business
8000 Foothills Blvd. MS 5555
Roseville, CA 95747-5555
Phone: 916 785 4187
Fax  : 916 785 1815
======================================
IEEE 802.3
10GBASE-CX4 Study Group
Interim Meeting - Dec 16,17 2002
Agenda
(Revised 12/13/2002)   

Monday - Dec 16th

Administration: (9:30a - 10:00a)
	*	Select/Confirm Chairman
	*	Appoint/Volunteer Secretary
	*	Appoint/Volunteer Document Editor
	*	Appoint/Volunteer Comment Editor

Presentations: (10:00a - 5:00p)
	*	"Pre-Emphasis and Equalization for 10GBASE-CX4" - Bill
Hoppin - 10:00 - 10:30a
	*	"Optimizing TX/RX implmentation for 10GBASE-CX4" - Dr. Ramin
Farjad-Rad - 10:30 - 11:00a
	*	"Proposal for Definition of Pre-emphasis" - Dimitry Taich -
11:00a - 11:15a
	*	"Jitter and Crosstalk Effects Using Infiniband Cables and
their Implication on Equalization Techniques" - Dr. Ze'ev Roth - 11:15 -
12:00p
	*	LUNCH 12:00 - 1:00p
	*	"CX4 Measurements-Simulation-Specification" - Howard Baumer
- 1:00 - 1:30p
	*	"10GBASE-CX4 Channel Spec" - Chris Diminico - 1:30 - 2:15p
	*	BREAK 2:15 - 2:30p
	*	"802.3 Clauses to Edit for 10GBASE-CX4" - Howard Baumer -
2:30 - 2:45p
	*	"Clause 54? Working Document" - Howard Baumer - 2:45 - 3:45p
	*	"PAR and Objectives" - Bob Grow, Dan Dove - 3:45 - 4:15p
	*	"Schedule Review" - Dan Dove - 4:15 - 5:00p


Tuesday Dec 17th

Presentations: (8:30a - 9:00a)
	*	"Considerations and Proposal for CX4 Compliance Channel"" -
Herb Van Deusen - 8:30 - 9:00a
	*	"Tradeoffs and Benefits of Equalization" - Peter Bradshaw -
9:00 - 9:20a
	*	"T11.2 Laison Report" - Shelto Van Doorn - 9:20 - 9:45a

Process: (9:45 - 12:00p)  (1:00 - 3:00p)
	*	Break out team and assign leaders for "Working Document"
adhoc
			o	Determine who/when changes will be defined
	*	Break out team and assign leaders for "Technical Issues"
adhoc
			o	Develop list of technical action items and
work plans

Wrap-up: (3:30p - 4:30p)
	*	Tech team report on issues/actions to be worked on for
January Interim
	*	Document team report on progress plan for January Interim