February 2005 Interim Week
P802.3an Task Force Meeting
Feb. 23 - 24, 2005
Santa Clara, CA
Document
Presenter(s)
Representing
all_files.zip
2
-Mar-05; 7213K
A
pproved minutes
2-Mar
-05; 33K
Agenda and General Information
25-Feb-05; 1478K
Brad Booth
Intel
ISO/IEC JTC 1/SC 25/WG 3 Liaison to IEEE 802.3, on present status of a Technical Report on qualification of installed cabling for 10GBASE-T, and on an Amendment to ISO/IEC 11801 that includes channels specified up to 500 MHz and 1 GHz
18-Feb-05; 316K
Draft 1.3 of TSB-155
14-Feb-05; 238K
Draft 1.4 of ANSI/TIA/EIA-568-B.2 Addendum 10
14-Feb-05; 579K
TIA TR-42 Liaison Letter to IEEE on Alien ELFEXT
19-Feb-05; 92K
TIA TR-42 Liaison Report
19-Feb-05; 79K
Paul Kish
Belden CDT
Editor's Report
23-Feb-05; 71K
Sanjay Kasturia
Teranetics
Comments received on D1.3
19-Feb-05; 130K
Comment responses on D1.3 (sorted by Clause #)
25-Feb-05; 156K
Comment responses on D1.3 (sorted by comment #)
25-Feb-05; 149K
Power Back Off With AFEXT
24-Feb-05; 261K
Bijit Halder
Plato Networks
Effect of Transmit Distortion On Receiver SNR
18-Feb-05; 117K
Bijit Halder
Plato Networks
Comments on Draft 1.3
24-Feb-05; 425K
Brett McClellan
SolarFlare
Proposal for Transmitter Linearity Specification (SNDR Method)
21
-Feb-05; 1421K
Chris Pagnanelli
SolarFlare
Proposal for Transmitter Timing Jitter Specification
21-Feb-05; 1227K
Chris Pagnanelli
SolarFlare
Pseudo Random Test Pattern for BER Monitor
18-Feb-05; 197K
Katsutoshi Seki
NEC Electronics
Draft 1.3 Comment details
18-Feb-05; 59K
Jose Tellado
Teranetics
10GBASE-T Transmitter SNDR Definition (System ID Approach)
22-Feb-05; 190K
Albert Vareljian
KeyEye
Power Backoff
20-Feb-05; 995K
George Zimmerman
Jose Tellado
SolarFlare
Teranetics
Concerns with Installed Cabling for 10GBASE-T
23-Feb-05; 1000K
Scott Powell
Broadcom
Return to P802.3an Home Page
Last Update: 20 March 05