May 2008 Interim Meeting
IEEE P802.3ba 40Gb/s and 100Gb/s Ethernet Task Force

May 12-15, 2008
Munich, Germany

 

Meeting Materials

  all_files.zip
7-May-08
8.58M
     
Approved Meeting Minutes
19-May-08
79K

George Oulundsen

OFS


  General  

  Agenda and General Information
7-May-08
283K
  John D'Ambrosia   Force10 Networks
  Chief Editor's Report
7-May-08
78K
  Ilango Ganga   Intel

  Liaisons & Communications  

  OIF Letter regarding Common Electrical I/O – 28 Gbps – Short Reach Project
13-May-08
112K
Liaison report from ISO/IEC JTC 1/SC 25/WG 3 to IEC SC 86A on Maximum attenuation values for buffered and cabled B1.3 Optical Fibres
7-May-08
21K
ISO/IEC JTC 1/SC 25/WG

  Presentations Related to Architecture / Interfaces   

Level Setting – Interfaces and Architecture
7-May-08
349K

Gary Nicholl

Mark Nowell

John D'Ambrosia

Ilango Ganga

Adam Healey

Cisco

Cisco

Force10 Networks

Intel

LSI

40/100G Architecture and Interfaces proposal
7-May-08
120K

Ilango Ganga

Brad Booth

Gary Nicholl

Howard Frazier

Shimon Muller

Intel

AMCC

Cisco

Broadcom

Sun

XL/CGMII and RS Proposal
7-May-08
55K
Mark Gustlin Cisco
100/40Ge PCS proposal
7-May-08
91K
Mark Gustlin Cisco
100/40Ge PMA proposal
7-May-08
53K
Mark Gustlin Cisco
Dynamic skew for MLD
7-May-08
61K

Mark Gustlin

Pete Anslow

Cisco

Nortel

100/40GE Max skew budget for MLD
12-Mar-08
568K

Brad Booth

Keith Conroy

Francesco Caggioni

Dimitris Giannakopoyulos

AMCC

Propagation Delay Skew in Multimode Channels
(Attaching backup spreadsheet by Paul Kolesar, Systimax)  
8-May-08
135K

Paul Kolesar

Pete Anslow

Systimax

Nortel

XLAUI/CAUI Electrical Specifications
7-May-08
701K

Ali Ghiasi

Ryan Latchman

Broadcom

Gennum

The equivalent of XAUI and other architectural considerations in 40G/100G Ethernet
7-May-08
60K
Piers Dawe Avago
IPG Considerations
7-May-08
251K

Faisal Dada

Norbert Folkens

JDSU

Proposal for FEC in 40G/100G Ethernet
7-May-08
36K

Piers Dawe

John Petrilla

Avago

Observations on Electrical Definition for Non-retimed PMD Service Interface
7-May-08
251K

Gary Nicholl

Mark Nowell

Cisco

Proposed Characteristics for 40GBASE-SR4 & 100GBASE-SR10 TP1 & TP4 PMD Service Interfaces
7-May-08
134K

John Petrilla

Avago


  Presentations related to OTN Objective   

Appropriate Support for OTN Baseline Proposal
7-May-08
162K

Steve Trowbridge

Alcatel-Lucent

PHY error rate monitoring for 40GbE and 100GbE
7-May-08
187K

Gary Nicholl

Cisco

PHY OAM and Lane Fault Monitoring
12-Mar-08
918K

Li Zeng

Min Ye

Qiwen Zhong

WB Jiang

Huawei

40GE and 100GE Transport over OTN
12-Mar-08
773K

Li Zeng

Qiwen Zhong

WB Jiang

Huawei


  Presentations Related to 40GbE / 100 GbE SMF Objectives  

Choice of grid for 10km 100GbE
7-May-08
18K

Pete Anslow

Joel Goergen

John Jaeger

Andy Moorwood

Jeffery Maki

Mark Nowell

Gary Nicholl

Steve Trwobridge

Jesse Simsarian

Nortel

Force10 Networks

Infinera

Infinera

Juniper

Cisco

Cisco

Alcatel-Lucent

Alcatel-Lucent

100GE 10km SMF PMD
7-May-08
181K

Chris Cole

Bernd Huebner

Pete Anslow

John Johnson

Radha Nagarajan

Hirotaka Oomori

Finisar

Finisar

Nortel

CyOptics

Infinera

Sumitomo

10x10G WDM 10km SMF PMD Proposal
7-May-08
572K

Thomas Schrans

Jim Tavacoli

Santur

100GE 40km SMF PMD
7-May-08
215K

Chris Cole

Pete Anslow

Ramon Gutierrez

Wenbin Jiang

John Johnson

Radha Nagarajan

Hirotaka Oomori

Matt Traverso

Finisar

Nortel

UNAM

Huawei

CyOptics

Infinera

Sumitomo

Opnext

40GE 10km SMF PMD
7-May-08
104K

Chris Cole

Eddie Tsumura

Finisar

ExceLight

40GE 10km SMF PMD configuration
7-May-08
258K

Youichi Akasaka

Kazuyuki Mori

Hideki Isono

Fujitsu

40GbE Serial Proposal
7-May-08
64K

Jack Jewell

JDSU

40GbE 10km SMF Serial Proposal (Updated)
19-May-08
176K

Farzin Firoozmand

Hideki Isono

Jack Jewell

Kazuyuki Mori

Song Shang

Matt Traverso

SMI

Fujitsu Ltd

JDSU

Fujitsu Lab

SMI

Opnext


  Presentations Related to 40GbE / 100 GbE MMF Objectives   

40Gb/s SMF and MMF Considerations
20-Mar-08
290K

Frank Chang

Ali Ghiaisi

Vitesse

Broadcom

Proposal for a PMD for 100GBASE-SR10 and 40GBASE-SR4 and Related Specifications
7-May-08
215K

Petar Pepeljugoski

Piers Dawe

John Petrilla

John Dallesasse

Kenneth Jackson

Lew Aronson

Jonathan King

Chris Cole

Mike Dudek

Jack Jewell

Phil McClay

IBM

Avago Technologies

Avago Technologies

Emcore

Emcore

Finisar

Finisar

Finisar

JDSU

JDSU

Zarlink

Exploring the Transmitter Parameter Space for 100m Links for 100GBASE-SR10 and 40GBASE-SR4
7-May-08
34K

Petar Pepeljugoski

IBM

Analysis of 40GBASE-SR4 & 100GBASE-SR10 Proposals
7-May-08
73K

John Petrilla

Avago

Proposal for Extended Reach MMF Link Characteristics
7-May-08
67K

Jack Jewell

JDSU

Connector loss budgeting methodology for parallel multimode PMDs'
7-May-08
82K

Jonathan King

Finisar

40Gbit/s and 100 Gbit/s Transmission over OM3 Duplex Fiber
7-May-08
261K

J.R. Kropp

N. Ledentsov

J Lott

H. Quast

V-I Systems

Introduction of 25Gbps Directly Modulated VCSELs
20-Mar-08
415K

Kenichiro Yashiki

Hikaru Kouta

NEC


  Presentations Related to 40GbE Backplane Objective   

40GBASE-KR4 backplane PHY proposal and Next Steps
20-Mar-08
235K

Rich Mellitz

Ilango Ganga

Intel


  Presentations Related to 40 GbE / 100 GbE Cu Cabling Objectives   

802.3ba copper cable assembly proposal
7-May-08
864K

Chris Diminico

MC Communications

FEC and Auto-Neg proposal for 40/100G copper cable assembly
7-May-08
77K

Ilango Ganga

Intel

Adaptive Transmit Equalization Proposal for 40GBASE-CR4 and 100GBASE-CR10
20-Mar-08
114K

Amir Mezer

Adee Ran

Intel

SFF-8470 10GBASE-KR Concepts for 802.3ba
7-May-08
415K

Bob Thornton

Fujitsu

Proposal for New Internal and External High Density 10 X 10.3125 Gbps Connector System based on 10GBASE-KR
18-May-08
364K

Michael Fogg

Tyco


Return to IEEE P802.3ba Home Page
Last Update: 18 May 2008
Questions or comments: send e-mail to Webmaster