Meeting Materials
all_files.zip 7-May-08 8.58M |
|||||
Approved Meeting Minutes 19-May-08 79K |
George Oulundsen |
OFS | |||
  General   | |||||
Agenda and General Information 7-May-08 283K |
John D'Ambrosia | Force10 Networks | |||
Chief Editor's Report 7-May-08 78K |
Ilango Ganga | Intel | |||
  Liaisons & Communications   | |||||
OIF Letter regarding Common Electrical I/O – 28 Gbps – Short Reach Project 13-May-08 112K |
|||||
Liaison report from ISO/IEC JTC 1/SC 25/WG 3 to IEC SC 86A on Maximum attenuation values for buffered and cabled B1.3 Optical Fibres
7-May-08 21K |
ISO/IEC JTC 1/SC 25/WG | ||||
  Presentations Related to Architecture / Interfaces    | |||||
Level Setting – Interfaces and Architecture 7-May-08 349K |
Gary Nicholl Mark Nowell John D'Ambrosia Ilango Ganga Adam Healey |
Cisco Cisco Force10 Networks Intel LSI | |||
40/100G Architecture and Interfaces proposal 7-May-08 120K |
Ilango Ganga Brad Booth Gary Nicholl Howard Frazier Shimon Muller |
Intel AMCC Cisco Broadcom Sun | |||
XL/CGMII and RS Proposal 7-May-08 55K |
Mark Gustlin | Cisco | |||
100/40Ge PCS proposal 7-May-08 91K |
Mark Gustlin | Cisco | |||
100/40Ge PMA proposal 7-May-08 53K |
Mark Gustlin | Cisco | |||
Dynamic skew for MLD 7-May-08 61K |
Mark Gustlin Pete Anslow |
Cisco Nortel | |||
100/40GE Max skew budget for MLD 12-Mar-08 568K |
Brad Booth Keith Conroy Francesco Caggioni Dimitris Giannakopoyulos |
AMCC
| |||
Propagation Delay Skew in Multimode Channels (Attaching backup spreadsheet by Paul Kolesar, Systimax)   8-May-08 135K |
Paul Kolesar Pete Anslow |
Systimax Nortel | |||
XLAUI/CAUI Electrical Specifications 7-May-08 701K |
Ali Ghiasi Ryan Latchman |
Broadcom Gennum | |||
The equivalent of XAUI and other architectural considerations in 40G/100G Ethernet 7-May-08 60K |
Piers Dawe | Avago | |||
IPG Considerations 7-May-08 251K |
Faisal Dada Norbert Folkens |
JDSU
| |||
Proposal for FEC in 40G/100G Ethernet 7-May-08 36K |
Piers Dawe John Petrilla |
Avago
| |||
Observations on Electrical Definition for Non-retimed PMD Service Interface 7-May-08 251K |
Gary Nicholl Mark Nowell |
Cisco
| |||
Proposed Characteristics for 40GBASE-SR4 & 100GBASE-SR10 TP1 & TP4 PMD Service Interfaces 7-May-08 134K |
John Petrilla |
Avago | |||
  Presentations related to OTN Objective    | |||||
Appropriate Support for OTN Baseline Proposal 7-May-08 162K |
Steve Trowbridge |
Alcatel-Lucent | |||
PHY error rate monitoring for 40GbE and 100GbE 7-May-08 187K |
Gary Nicholl |
Cisco | |||
PHY OAM and Lane Fault Monitoring 12-Mar-08 918K |
Li Zeng Min Ye Qiwen Zhong WB Jiang |
Huawei
| |||
40GE and 100GE Transport over OTN 12-Mar-08 773K |
Li Zeng Qiwen Zhong WB Jiang |
Huawei
| |||
  Presentations Related to 40GbE / 100 GbE SMF Objectives   | |||||
Choice of grid for 10km 100GbE 7-May-08 18K |
Pete Anslow Joel Goergen John Jaeger Andy Moorwood Jeffery Maki Mark Nowell Gary Nicholl Steve Trwobridge Jesse Simsarian |
Nortel Force10 Networks Infinera Infinera Juniper Cisco Cisco Alcatel-Lucent Alcatel-Lucent | |||
100GE 10km SMF PMD 7-May-08 181K |
Chris Cole Bernd Huebner Pete Anslow John Johnson Radha Nagarajan Hirotaka Oomori |
Finisar Finisar Nortel CyOptics Infinera Sumitomo | |||
10x10G WDM 10km SMF PMD Proposal 7-May-08 572K |
Thomas Schrans Jim Tavacoli |
Santur
| |||
100GE 40km SMF PMD 7-May-08 215K |
Chris Cole Pete Anslow Ramon Gutierrez Wenbin Jiang John Johnson Radha Nagarajan Hirotaka Oomori Matt Traverso |
Finisar Nortel UNAM Huawei CyOptics Infinera Sumitomo Opnext | |||
40GE 10km SMF PMD 7-May-08 104K |
Chris Cole Eddie Tsumura |
Finisar ExceLight | |||
40GE 10km SMF PMD configuration 7-May-08 258K |
Youichi Akasaka Kazuyuki Mori Hideki Isono |
Fujitsu
| |||
40GbE Serial Proposal 7-May-08 64K |
Jack Jewell |
JDSU | |||
40GbE 10km SMF Serial Proposal (Updated) 19-May-08 176K |
Farzin Firoozmand Hideki Isono Jack Jewell Kazuyuki Mori Song Shang Matt Traverso |
SMI Fujitsu Ltd JDSU Fujitsu Lab SMI Opnext | |||
  Presentations Related to 40GbE / 100 GbE MMF Objectives    | |||||
40Gb/s SMF and MMF Considerations 20-Mar-08 290K |
Frank Chang Ali Ghiaisi |
Vitesse Broadcom | |||
Proposal for a PMD for 100GBASE-SR10 and 40GBASE-SR4 and Related Specifications 7-May-08 215K |
Petar Pepeljugoski Piers Dawe John Petrilla John Dallesasse Kenneth Jackson Lew Aronson Jonathan King Chris Cole Mike Dudek Jack Jewell Phil McClay |
IBM Avago Technologies Avago Technologies Emcore Emcore Finisar Finisar Finisar JDSU JDSU Zarlink | |||
Exploring the Transmitter Parameter Space for 100m Links for 100GBASE-SR10 and 40GBASE-SR4 7-May-08 34K |
Petar Pepeljugoski |
IBM | |||
Analysis of 40GBASE-SR4 & 100GBASE-SR10 Proposals 7-May-08 73K |
John Petrilla |
Avago | |||
Proposal for Extended Reach MMF Link Characteristics 7-May-08 67K |
Jack Jewell |
JDSU | |||
Connector loss budgeting methodology for parallel multimode PMDs' 7-May-08 82K |
Jonathan King |
Finisar | |||
40Gbit/s and 100 Gbit/s Transmission over OM3 Duplex Fiber 7-May-08 261K |
J.R. Kropp N. Ledentsov J Lott H. Quast |
V-I Systems
| |||
Introduction of 25Gbps Directly Modulated VCSELs 20-Mar-08 415K |
Kenichiro Yashiki Hikaru Kouta |
NEC
| |||
  Presentations Related to 40GbE Backplane Objective    | |||||
40GBASE-KR4 backplane PHY proposal and Next Steps 20-Mar-08 235K |
Rich Mellitz Ilango Ganga |
Intel
| |||
  Presentations Related to 40 GbE / 100 GbE Cu Cabling Objectives    | |||||
802.3ba copper cable assembly proposal 7-May-08 864K |
Chris Diminico |
MC Communications | |||
FEC and Auto-Neg proposal for 40/100G copper cable assembly 7-May-08 77K |
Ilango Ganga |
Intel | |||
Adaptive Transmit Equalization Proposal for 40GBASE-CR4 and 100GBASE-CR10 20-Mar-08 114K |
Amir Mezer Adee Ran |
Intel
| |||
SFF-8470 10GBASE-KR Concepts for 802.3ba 7-May-08 415K |
Bob Thornton |
Fujitsu | |||
Proposal for New Internal and External High Density 10 X 10.3125 Gbps Connector System based on 10GBASE-KR 18-May-08 364K |
Michael Fogg |
Tyco |
Return to IEEE P802.3ba
Home Page
Last Update: 18 May 2008
Questions or comments: send e-mail to Webmaster