May 2009 Interim Meeting
IEEE P802.3ba 40Gb/s and 100Gb/s Ethernet Task Force

May 4 - 7, 2009
Quebec, Quebec, Canada

 

Meeting Materials

  all_files.zip
13-May-09
11.6M
   
  Task Force Received Comments against Draft 2.0
(Listed by Clause) OR (Listed by ID)
6-May-09
783k and 772k
     
  Proposed Responses to Comments against Draft 2.0
(Listed by Clause) OR (Listed by ID)
30-Apr-09
1.01M and 999k
     
  Final Responses to Comments against Draft 2.0
(Listed by Clause) OR (Listed by ID)
6-May-09
1.01M and 1.02M
     
  Unsatisfied negative comments against Draft 2.0
30-May-09
83.5M
     
  Approved Meeting Minutes
10-Oct-09
64K
  George Oulundsen   OFS

  General Information  

  Agenda and General Information
4-May-09
653K
  John D'Ambrosia   Force10 Networks
  Chief Editor's Opening Report
4-May-09
94K
  Ilango Ganga   Intel
  Logic SubTask Force - Opening Report
4-May-09
26K
  Mark Gustlin   Cisco
  Cu SubTask Force - Opening Report
4-May-09
49K
  Chris DiMinico   MC Communications
  Optical SubTask Force - Opening Report
4-May-09
16K
  Pete Anslow   Nortel
  Task Force Discussion
4-May-09
26K
  Pete Anslow   Nortel
  Logic Sub Task Force Agenda and General Information
6-May-09
36K
  Mark Gustlin   Cisco
  Cu Sub Task Force Agenda and General Information
9-May-09
28K
  Chris DiMinico   MC Communications
  Optical Sub Task Force Agenda and General Information
4-May-09
32K
  Pete Anslow   Nortel
  Logic SubTask Force - Closing Report
9-May-09
7K
  Mark Gustlin   Cisco
  Cu SubTask Force Closing Report
9-May-09
17K
  Chris DiMinico   MC Communications
  Optical SubTask Force - Closing Report
9-May-09
13K
  Pete Anslow   Nortel
  Chief Editor's Closing Report
9-May-09
114K
  Ilango Ganga   Intel

  Comments for Task Force  

Comment#76: MTTFPA for 100GbE Copper Interface (10GBASE-CR10)
(spreadsheet)
30-Apr-09
63K

Mark Gustlin

Pete Anslow

Cisco

Nortel

Comment#447-8: Proposal for Equation and Figure Consistency
30-Apr-09
67K

John D'Ambrosia

Pete Anslow

Force10 Networks

Nortel

Comment #451: Standardized Naming Nomenclature for Mixed Mode S-Parameter Measurements
30-Apr-09
259K

John D'Ambrosia

Mike Resso

Force10 Networks

Agilent

Comment#487,648: Proposed Text for Single Service Interface
5-May-09
48K

Ilango Ganga

John D'Ambrosia

David Law

Mark Gustlin

Steve Trowbridge

Intel

Force10 Networks

3COM

Cisco

Alcatel-Lucent

Comment#609: Common Pluggable Interface for 100GBASE-CR10 and 100GBASE-SR10
5-May-09
395K

Galen Fromm

John Petrilla

Molex

Avago


  Comments for Logic Sub Task Force  

Comment#49, 57: Improved PRBS31 testing
30-Apr-09
29K

Piers Dawe

Avago

Comment#743,745,750: Proposed Changes
30-Apr-09
41K

Mark Gustlin

Cisco

Comment#753: Proposed Figure
4-May-09
23K

Steve Trowbridge

Alcatel-Lucent


  Comments for Cu Sub Task Force  

Comment#74: Clause 73 exchange of DME frames not needed for frontpanel ports
30-Apr-09
25K

Piers Dawe

Avago

Comment#394,395,401,402,403,417: Accurately Defining the CR4/CR10 Test Points
30-Apr-09
402K

Ali Ghiaisi

Broadcom

Comment#396,398,400: Comprehensive TP2 and TP3 Testing
30-Apr-09
684K

Ali Ghiaisi

Vivek Telang

Magesh Valliappan

Broadcom

Comment#405,407-12, 419-20: Refinement to XLAUI/CAUI Electrical Specifications
30-Apr-09
639K

Ali Ghiaisi

Broadcom

Comment#476: Mode Transformation Mode Transformation for 40GBASE-R and 100GBASE-R
1-May-09
105K

Chang Y.F.

Zhou X.J.

Wu C.B.

ZTE

Comment#697: CR4 and CR10 TP2 Specifications
30-Apr-09
127K

Briam Misek

Charles Moore

Avago

Comment#700: CR4 and CR10 TP3 Specifications
30-Apr-09
79K

Charles Moore

Briam Misek

Avago

EyeMax 3m 28 AWG Cable Assembly Vs IEEE P802-3ba Spec. Draft 2.0
30-Apr-09
96K

Vittal Balasubramanian

FCI

Comment#788: Requirements for Measurement Receiver Bandwidth and Jitter Floor
30-Apr-09
133K

Mike Li

Pavel Zivny

Altera

Tektronix

Material related to Comments on Fig. 83A-13 and 83B-3
30-Apr-09
7K

Ernie Bergmann

JDSU

Test Point proposals for CR4/10
13-May-09
486K

Tom Palkert

Xilinx / Luxtera


  Comments for Optical Sub Task Force  

Optical Sub Task Force Budgets
30-Apr-09
15K

Pete Anslow

Nortel

Comment#83,87,89,91,217,228,257-262, 276, 277, 353, 693, 694 and 779: SR4 and SR10 Link Model-Budget Update
30-Apr-09
223K

John Petrilla

Avago

Comment#86: TP1a mask, noise and jitter for SRn
30-Apr-09
171K

Piers Dawe

Avago

Comment#217: Impact of including OM4 as a fiber type option
5-May-09
499K

Rick Pimpinella

Panduit

Comment#276,353: Proposals for Clause 86: Improved TDP Test
30-Apr-09
165K

Paul Kolesar

Mike Dudek

Commscope

Independent

Comment#276,353: Content for clause 86.7.5.4 TDP test
30-Apr-09
124K

Paul Kolesar

Mike Dudek

Commscope

Independent

Comment#277: Proposal for Informative Annex for Extended Reach
30-Apr-09
127K

Paul Kolesar

Mike Dudek

Commscope

Independent

Comment#277: Annex 86A if TDP test modification made normative
30-Apr-09
93K

Paul Kolesar

Mike Dudek

Commscope

Independent

Comment#277: Annex 86A if TDP test modifications not normative
30-Apr-09
134K

Paul Kolesar

Mike Dudek

Commscope

Independent

Comment#404: PPI MCB and HCB Results Per of CL86
5-May-09
720K

Ali Ghiaisi

Broadcom

Comments Against 86
5-May-09
19K

Piers Dawe

Avago


  Late Presentations  

CR4/10 TP2/TP0 Parametric Specification and Measurement Methodology
5-May-09
105K

Matt Brown

Applied Micro

Comment#242, 267: Insertion loss measurements of installed fiber cables
5-May-09
129K

Steve Swanson

Corning

Limiting Versus Linear Optical Receiver for Stressed Receiver Sensitivity
5-May-09
101K

Atul Gupta

Francis Ho

Inphi

Service Interface Discussion
6-May-09
36K

Brad Booth

Applied Micro

Comparison of CRn and SRn PCB recommendations
6-May-09
12K

Piers Dawe

Avago

ganga_04_0509.pdf: Resolution of Comment 648: Update to ganga_03_0509.pdf based on Discussion in Logic Sub Task Force
6-May-09
59K

Ilango Ganga

Intel


Return to IEEE P802.3ba Home Page
Last Update: 10 Oct 2009


Questions or comments: send e-mail to
Webmaster