March 2004 Plenary Week
Backplane Ethernet Study Group Meeting

March 16-18, 2004
Lake Buena Vista, FL

 

  all_files.zip
22-Mar-04
3956K

 
 
Approved Meeting Minutes
2-Jun-04
139K
John D'Ambrosia Tyco Electronics
Opening Plenary Report
22-Mar-04
90K
Adam Healey Agere Systems
  Agenda and General Information
22-Mar-04
163K
  Adam Healey Agere Systems
10 GbE Serial PHY Requirements
11-Mar-04
105K
Michael Altmann
Aniruddha Kundu
Intel
  Relative Cost for Backplanes and Blades
16-Mar-04
135K

John D'Ambrosia
Jimmy Sheffield
Tyco Electronics
 

Next Generation System Costs:  A True Look
16-Mar-04
954K

 

Mike Oltmanns
Gautam Patel

Brian Seemann

John Mitchell

Interconnect Technologies

Teradyne

Xilinx

Winchester Electronics

  Channel Model Criteria
16-Mar-04
1021K
  Joel Goergen Force10 Networks
  Ethernet over the backplane system requirements
12-Mar-04
277K
  Tom Palkert Xilinx
  Market Drivers and Cost Considerations in Support of 40 inch average grade FR4 backplane links at 10Gb/s per lane
22-Mar-04
395K
 

Bill Hoppin

others

Synopsys

refer to presentation for

complete listing

  1/10Gbps Autonegotiation Schemes
12-Jan-04
90K
 

Luke Chang
Ilango Ganga

Brad Booth

Intel
Case for Enhancing Ethernet Capabilities for Backplane Fabric Interconnects
15-Mar-04
299K
  Gopal Hegde Intel
Throughput & Latency Control in Ethernet Backplane Interconnects
11-Mar-04
255K
 

Manoj Wadekar
Gary McAlpine

Intel
Developing a Channel Model to Include Variance
11-Mar-04
1059K
John D'Ambrosia
Greg Sheets
Tyco Electronics
Agere Systems
Comparison of PAM-4 and NRZ Signaling
11-Mar-04
68K

Stephen Anderson

others

Xilinx
refer to presentation 

for complete listing

Backplane Ethernet Auto-Negotiation
17-Mar-04
50K
Thomas Jorgensen Vitesse
FR-4 Definition
17-Mar-04
109K
Joel Goergen Force10 Networks
Closing Plenary Report
22-Mar-04
135K
Adam Healey Agere Systems

 


Return to IEEE 802.3 Backplane Ethernet Study Group Home Page
Last Update: 02 Jun 04

 


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]