|
All files (zipped) |
13.0MB |
|
|
|
Title |
Size |
Author(s) |
Affiliation |
|
28-29 October TF meeting minutes - Approved 13 Nov 2013
Previous: (Unconfirmed)
| 246kB |
Duane Remein Mark Laubach |
Huawei, Broadcom |
|
27-28 September TF meeting minutes (approved)
Previous: 27-28 September TF meeting minutes 01a (unconfirmed) (228kB - PDF),
27-28 September TF meeting minutes 01 (unconfirmed) (228kB - PDF)
| 246kB |
|
|
|
Agenda and General Information |
78kB |
Mark Laubach |
Broadcom |
|
ad hoc report: Evaluation Criteria and Requirements |
263kB |
Steve Shellhammer |
Qualcomm |
|
ad hoc report: PHY Link |
92kB |
Ed Boyd |
Broadcom |
|
ad hoc report: Channel Model |
325kB |
Duane Remein |
Huawei |
|
ad hoc report: RF Spectrum |
263kB |
Steve Shellhammer |
Qualcomm |
|
Potential IEEE P802.3bn architecture |
k76B |
David Law |
HP |
|
Multiple Modulation Profiles for EPOC rev 01b
Previous: Multiple Modulation Profiles for EPOC rev 01a(147kB - PDF),
Multiple Modulation Profiles for EPOC (356kB - PDF)
|
1.4MB |
Eugene Dai, Marek Hajduczenia |
Cox Communications, ZTE |
|
EPoC Requirement from JSCN |
108kB |
Gao Xiaojun |
Jiangsu Province Cable Network Company |
|
Cable network introdution, EPOC requirements and expectation from SXBCTV |
562kB |
Xu Qiheng |
Shanxi Province Broadcast Cable TV Network Company |
|
Discussion on EPoC PHY Functions |
443kB |
Rujian Lin |
Luster Teraband Photonics Co., Ltd. |
|
Spectrum planning and access network architecture from GZCTV rev 01a
Prfevious: Spectrum planning and access network architecture from GZCTV (808kB - PDF)
|
596kB |
Zhang Bo |
GuiZhou Province Cable TV Network Company |
|
EPoC Frequency Bands and Center Frequencies |
322kB |
Juan Montojo, Masoud Zargari, Alex Liu |
Qualcomm |
|
EPoC Deployment Scenarios |
498kB |
Bill Powell, Randy Sharpe |
Alcatel-Lucent |
|
Cable channel modeling based on Chinese MSO's cable network |
1.8MB |
Wu Guangsheng |
Huawei |
|
Cable channel test report by XYBN rev 01a
Previous: Cable channel test report by XYBN (64kB - PDF) |
60kB |
Hu Xiaoping |
Xiangyang Cable Network, Hubei Province |
|
HFC network introduction and EPOC requirements from ZSCN |
547kB |
Zhang Dongqing |
Zhongshan Cable Network, Guangdong Province |
|
MDU cable network channel S parameter measurements - Tested in Wuxi city, Jiangsu province rev 02b
Previous: MDU cable network channel S parameter measurements - Tested in Wuxi city, Jiangsu province rev 02a (350kB - PDF), MDU cable network channel S parameter measurements - Tested in Wuxi city, Jiangsu province (398kB - PDF)
|
387kB |
Gao Xiaojun |
Jiangsu Province Cable Network Company |
|
OCN Cable Access Planning |
334kB |
Ru Wei Guang |
Oriental Cable Networks |
|
Brief introduction on China Cable network and requirements |
86kB |
Yao Yong |
China Radio & TV Association Technical Committee |
|
Best Effort: |
|
Changes to MAC and MACC in EPoC project |
186kB |
Marek Hajduczenia |
ZTE |