* * *
P8023.bn EPoC PHY Task Force
* * *
September, 2012 Meeting Material
September 27-28 ITU, Geneva, Switzerland
* * *


All files (zipped) 21.6MB
Title Size Author(s) Affiliation
27-28 September TF meeting minutes (approved)
Previous: 27-28 September TF meeting minutes (unconfirmed) (228kB - PDF)
246kB
17-18 July SG meeting minutes (confirmed)
Previous: (rev2 - pdf 246kB) (rev1 - pdf 222kB)
711kB
Agenda and General Information
Previous: (rev2 - pdf 504kB), (rev1 - pdf 504kB)
850kB Mark Laubach Broadcom
Baseline Proposals for EPoC TF - the WHAT and the WHY 164kB Marek Hajduczenia ZTE
Baseline Proposals for EPoC TF 205kB Marek Hajduczenia ZTE
Baseline support file: definitions
Baseline support file: clause outlines
Baseline support file: PMD outline
219kB
166kB
Marek Hajduczenia
(et al.)
ZTE
(et al.)
Developing the EPoC System and Device Specifications
as a CL/MSO effort

Previous: (01 - pdf 69kB)
70kB Jorge Salinger Comcast
Bandwidth Assignment method for EPOC 1455kB Eugene Dai Cox
EPoC Discover & Registration 765kB Duane Remein Huawei
EPoC PHY Link and Auto-Negotiation 277kB Ed Boyd,
Avi Kliger.
Broadcom
EPoC Downstream Bonding 881kB Ed Boyd
(et al.)
Broadcom
(et al.)
OFDMA PHY for EPoC: a Baseline Proposal 948kB Andrea Garavaglia,
Christian Pietsch
Qualcomm
Solutions for a flexible dual-mode TDD/FDD
physical layer in EPoC (TDD feasibility Part II)
756kB Nicola Varanese,
Andrea Garavaglia
Qualcomm
EPoC Performance Model – Delay and Efficiency (PDF) 418kB Andrea Garavaglia
(et al.)
Qualcomm
(et al.)
Excel Spreadsheet for EPoC Performance Model
– Delay and Efficiency
(zip file under tools)
30kB Andrea Garavaglia Qualcomm
EPoC RF Bandwidth Task Force Choices 639kB Steve Shellhammer,
Hesham ElBakoury
Qualcomm,
Huawei
EPoC FDD Downstream RF Bandwidth – A Baseline Proposal
Previous: (02 - pdf 574kB)
568kB Steve Shellhammer,
Juan Montojo
Qualcomm
Forward Error Correction – A Baseline Proposal
Previous: (01 pdf - 344kB)
793kB Christian Pietsch,
David Barr
Qualcomm,
Entropic
Analysis on estimated SNR values on a generic cable plant
Previous: (01 - pdf 163kB)
163kB Nicola Varanese,
Andrea Garavaglia
Qualcomm
Power Saving for EPoC
Previous: (01 pdf - 326kB)
327kB Marek Hajduczenia
(et al.)
ZTE
Basline Proposal for EPoC PHY Layer
Previous: (01 pdf - 628kB)
673kB Avi Kliger,
Leo Montreuil
Broadcom
FEC for EPoC PHY
Previous: (01b pdf - 924kB), (01a pdf - 1459kB), (01 pdf - 1461kB)
1257kB Rich Prodan,
(et al.)
Broadcom
OFDM Symbol size considerations for EPoC
Previous: (02a pdf - 427kB),(02 pdf - 293kB)
447kB Avi Kliger
(et al.)
Broadcom
MPCP Extensions for EPoC
Previous: (01 - pdf 617kB)
766kB Lup Ng Cortina
Adaptive Bit Loading 548kB Hesham Elbakoury Huawei
Efficiency Considerations for EPoC PHY Design 453kB Hesham Elbakoury Huawei
Best Effort / Late Submission
(Major) challenges ahead for EPoC 573kB Marek Hajduczenia ZTE



Return to IEEE P802.3bn EPoC PHY Task Force Public Area
Last Update: 19-September-2012


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]