|
All files (zipped) |
21.6MB |
|
|
|
Title |
Size |
Author(s) |
Affiliation |
|
27-28 September TF meeting minutes (approved)
Previous: 27-28 September TF meeting minutes (unconfirmed) (228kB - PDF)
| 246kB |
|
|
|
17-18 July SG meeting minutes (confirmed)
Previous: (rev2 - pdf 246kB)
(rev1 - pdf 222kB) |
711kB |
|
|
|
Agenda and General Information
Previous: (rev2 - pdf 504kB),
(rev1 - pdf 504kB)
|
850kB |
Mark Laubach |
Broadcom |
|
Baseline Proposals for EPoC TF - the WHAT and the WHY |
164kB |
Marek Hajduczenia |
ZTE |
|
Baseline Proposals for EPoC TF |
205kB |
Marek Hajduczenia |
ZTE |
|
Baseline support file: definitions
Baseline support file: clause outlines
Baseline support file: PMD outline
|
219kB
166kB
|
Marek Hajduczenia
(et al.) |
ZTE
(et al.) |
|
Developing the EPoC System and Device Specifications as a CL/MSO effort
Previous: (01 - pdf 69kB) |
70kB |
Jorge Salinger |
Comcast |
|
Bandwidth Assignment method for EPOC |
1455kB |
Eugene Dai |
Cox |
|
EPoC Discover & Registration |
765kB |
Duane Remein |
Huawei |
|
EPoC PHY Link and Auto-Negotiation |
277kB |
Ed Boyd, Avi Kliger. |
Broadcom |
|
EPoC Downstream Bonding |
881kB |
Ed Boyd (et al.) |
Broadcom (et al.) |
|
OFDMA PHY for EPoC: a Baseline Proposal |
948kB |
Andrea Garavaglia, Christian Pietsch |
Qualcomm |
|
Solutions for a flexible dual-mode TDD/FDD physical layer in EPoC (TDD feasibility Part II) |
756kB |
Nicola Varanese, Andrea Garavaglia |
Qualcomm |
|
EPoC Performance Model – Delay and Efficiency (PDF) |
418kB |
Andrea Garavaglia (et al.) |
Qualcomm (et al.) |
|
Excel Spreadsheet for EPoC Performance Model
– Delay and Efficiency (zip file under tools) |
30kB |
Andrea Garavaglia |
Qualcomm |
|
EPoC RF Bandwidth Task Force Choices |
639kB |
Steve Shellhammer, Hesham ElBakoury |
Qualcomm, Huawei |
|
EPoC FDD Downstream RF Bandwidth – A Baseline Proposal
Previous: (02 - pdf 574kB)
|
568kB |
Steve Shellhammer, Juan Montojo |
Qualcomm |
|
Forward Error Correction – A Baseline Proposal
Previous: (01 pdf - 344kB) |
793kB |
Christian Pietsch,
David Barr |
Qualcomm,
Entropic |
|
Analysis on estimated SNR values on a generic cable plant
Previous: (01 - pdf 163kB) |
163kB |
Nicola Varanese, Andrea Garavaglia |
Qualcomm |
|
Power Saving for EPoC
Previous: (01 pdf - 326kB) |
327kB |
Marek Hajduczenia
(et al.) |
ZTE |
|
Basline Proposal for EPoC PHY Layer
Previous: (01 pdf - 628kB)
|
673kB |
Avi Kliger,
Leo Montreuil |
Broadcom |
|
FEC for EPoC PHY
Previous: (01b pdf - 924kB),
(01a pdf - 1459kB),
(01 pdf - 1461kB) |
1257kB |
Rich Prodan, (et al.) |
Broadcom |
|
OFDM Symbol size considerations for EPoC
Previous: (02a pdf - 427kB),(02 pdf - 293kB) |
447kB |
Avi Kliger
(et al.)
|
Broadcom |
|
MPCP Extensions for EPoC
Previous: (01 - pdf 617kB)
|
766kB |
Lup Ng |
Cortina |
|
Adaptive Bit Loading |
548kB |
Hesham Elbakoury |
Huawei |
|
Efficiency Considerations for EPoC PHY Design |
453kB |
Hesham Elbakoury |
Huawei |
Best Effort / Late Submission |
|
(Major) challenges ahead for EPoC |
573kB |
Marek Hajduczenia |
ZTE |