IEEE P802.3bq 40GBASE-T Task Force

Interim Meeting Material
May 16-17, 2013
Victoria, BC, Canada

Meeting Materials

All Files
   4MB   16-May-2013

General Information

Agenda and General Information
    14-May-2013   

David Chalupsky
Intel

Approved Minutes
    20-March-2014 

George Zimmerman CME Consulting
     
Liaisons and Communications
ISO IEC Proposed Draft Technical Report Draft 2 11801-99-1
16-May-2013  (password protected; use study group login)

Commenting form for PDTR Draft 2 11801-99-1
16-May-2013  (password protected; use study group login)

Presentations
 
    Title       Post date   Presenter   Affiliation
Size of Category 7/7A Installed Base 12-May-13 Val Maguire Siemon Company
ISO/IEC TR 11801-99-1 Guidance on 40GBASE-T Cabling
 - a tutorial -
 
12-May-13 Alan Flatman LAN Technologies
Alien Crosstalk Test Results for a Potential 40GBASE-T Channel 16-May-13 Ron Nordin Panduit
Noise immunity Performance Analysis of Screened Cabling Systems 12-May-13 Martin Rossbach Nexans
Channel Performance 12-May-13 Brad Booth Dell
Impact of Board-level Considerations on 40GBASE-T Channels 12-May-13 George Zimmerman CME Consulting
Importance of using scaled data as opposed to to limit lines in modeling channel impacts 12-May-13 George Zimmerman CME Consulting
Analysis of Cable Parameters using a 40GBASE-T PHY-to-PHY Channel Model 16-May-13 Mike Grimwood Broadcom
A Broad Market Potential Consideration for the Baseline Proposal 12-May-13 David Chalupsky Intel
Future Work Plans 16-May-13 David Chalupsky Intel
       

 


Return to 802.3bq 40BASE-T Task Force Public Area
Last Update: 20-March-2014


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]