IEEE 802 P802

IEEE P802.3bs 200 GbE & 400 GbE Task Force


 Plenary Meeting Material
July 15 - 17, 2014
San Diego, CA, USA

Meeting Materials

All Files
  23-Jul-14 (21.4M)

General Information

Agenda and General Information
    11-Jul-14 (397k)
John D'Ambrosia Dell
IEEE 802.3 Opening Plenary Report
    11-Jul-14 (726k)
John D'Ambrosia Dell
IEEE 802.3 Closing Plenary Report
   17-Jul-14 (156k)
John D'Ambrosia Dell
Task Force / Use Case Ad Hocs Update
     11-Jul-14 (42k)
John D'Ambrosia Dell
Logic Ad Hoc Update
     10-Jul-14 (72k)
Mark Gustlin Xilinx
SMF Ad Hoc Update
     10-Jul-14 (16k)
Pete Anslow Ciena
MMF Ad Hoc Update
     11-Jul-14 (64k)
Jonathan King Finisar
Approved Meeting Minutes
     17-Sep-14 (171k)
Peter Stassar Huawei

Liaisons & Communications

OIF to IEEE P802.3bs on CEI 56G Projects
     27-May-14
Nathan Tracy TE Connectivity

Meeting Presentations

A 400GbE Architectural Option
     10-Jul-14 (131k)
Pete Anslow
John D'Ambrosia
Mark Gustlin
Adam Healey
David Law
Gary Nicholl
Dave Ofelt
Steve Trowbridge
Ciena
Dell
Xilinx
Avago
HP
Cisco
Juniper
Alcatel-Lucent
400GbE MII Baseline Proposal
     10-Jul-14 (101k)
Mark Gustlin Xilinx
400GbE PCS Options
     10-Jul-14 (284k)
Mark Gustlin
Jerry Pepper
Andre Szczepanek
Steve Trowbridge
Tongtong Wang
Xilinx
Ixia
Inphi
Alcatel-Lucent
Huawei
BER / FLR Calculation Results for Multiplexing in PMA
     10-Jul-14 (749k)
Tongtong Wang
Xinyuan Wang
Wenbin Yang
Huawei
OTN Support Update
     10-Jul-14 (452k)
Steve Trowbridge Alcatel-Lucent
FOM Bit mux, Architecture, Challenge and Solution
     10-Jul-14 (849k)
Xinyuan Wang
Tongtong Wang
Wenbin Yang
Huawei
FEC performance on multi-part links
     10-Jul-14 (684k)
Pete Anslow Ciena
PAM4 test pattern characteristics
     10-Jul-14 (62k)
Pete Anslow Ciena
A CDAUI-16 Chip-to-Chip (c2c) and Chip-to-Module (c2m) Specification Proposal
     23-Jul-14 (341k)
Mike Li
Peter Anslow
Ryan Latchman
Altera
Ciena
Macom
Technical Feasibility of 56Gb/s NRZ Electrical Interface Signaling
     10-Jul-14 (906k)
Haoli Qian Credo Semi
PAM4 Modulation for the 400G Electrical Interface
     23-Jul-14 (557k)
Yuval Domb
Magesh Valliappan
Anthony Brewster
Vivek Telang
Broadcom
CDAUI-8 50Gb/s Mezzanine Chip to Chip Channels
     10-Jul-14 (731k)
Rich Mellitz
Adee Ran
Intel
400G-PSM4, Options for 500m Reach Interconnects
     23-Jul-14 (1.5M)
Brian Welch Luxtera
Updated Considerations  on a 4x112Gbps PAM4 Configuration for the 2km SMF PMD
     10-Jul-14 (366k)
Peter Stassar Huawei
400G DMT PMD for 2km SMF
     10-Jul-14 (618k)
David Lewis
Sacha Corbeil
Beck Mason
JDSU
Implementation of DMT transceiver for 400GbE 2km and 10km PMD using 4 wavelengths
     12-Jul-14 (1M)
Ian Dedic Fujitsu
Component BW requirement of 56Gbaud Modulations for 400GbE 2 & 10km PMD
     10-Jul-14 (886k)
Fei Zhu
Yangjing Wen
Yusheng Bai
Huawei
Application requirement for 400GE in 10km and above distance
     10-Jul-14 (1.4M)
Lu Huang
Yunbo Li
Xin Chang
China Mobile
China Mobile
Huawei
Further analyze of 8*50G  PAM4 for 10km SMF
     10-Jul-14 (1.3M)
Xu Yu
Zhenwei Cui
Xi Huang
Chuanbiao Wang
Huawei
400G Discrete Multi-Tone PMD for 10 km SMF
     23-Jul-14 (616k)
Toshiki Tanaka
Tomoo Takahara
Hideki Isono
Hisaya Sakamoto
Yuji Miyaki
Fujitsu Limited

Fujitsu Optical Components
10km PMD-a must for carrier network
     10-Jul-14 (1.3M)
Ayla Chang
Xiaolu Song
Junjie Li
Huawei
Huawei
China Telecom
400G & 4x100G SMF PMD Alternatives Study
     23-Jul-14 (1.3M)
Chris Cole Finisar
50G/λ vs.100G/λ SMF PMD Alternatives Study
     23-Jul-14 (261k)
Chris Cole Finisar
Four-wavelength 400G on Duplex SMF
    23-Jul-14 (877k)
Vipul Bhatt
Sudeep Bhoja
Mathieu Chagnon
Arash Farhood
Stephane Lessard
Mohamed Osman
Yves Painchaud
Carl Paquet
David Plant
Michel Poulin
Inphi
Inphi
McGill U.
Inphi
Ericsson
McGill U.
Teraxion
Teraxion
McGill Un.
Teraxion
Channel Characterization for Evaluating Advanced Modulation Systems
     10-Jul-14 (437k)
Will Bliss Broadcom
Proliferation and Consolidation
     10-Jul-14 (777k)
Dan Dove Dove Networking Solutions
Issues for fair comparison of PAM4 and DMT
     10-Jul-14 (348k)
Yoshiaki Sone NTT
Path to consensus on 400 GbE PMDs
     23-Jul-14 (901k)
Ali Ghiasi Ghiasi Quantum LLC
Tool for simulating 400 GbE Optical PMDs
     10-Jul-14 (1.9M)
Ali Ghiasi
Jigesh Patel
Enrico Ghillino
Dwight Richards
Ghiasi Quantum LLC
RSoft / Synopsys

College of Staten Island, CUNY
DMT Measurement Considerations
     10-Jul-14 (458k)
Greg Lecheminant
Bernd Nebendahl
Rolf Steiner
Agilent
Proposal Updates of Nyquist Modulation
     15-Jul-14 (301k)
Riu Hirai
Hidehiro Toyoda
Nobuhiko Kikuchi
Hitachi

Late Submissions

 Interface Considerations
     23-Jul-14 (483k)
Brad Booth Microsoft
Experimental Demonstration of 56Gb/s NRZ for 400GbE PMD
     23-Jul-14 (260k)
Mizuki Shirao
Keisuke Kojima
Mitsubishi
 400G SMF PMD Approaches - A System Vendor’s perspective
     10-Jul-14 (138k)
Gary Nicholl
Mark Nowell
John D'Ambrosia
Steve Trowbridge
Peter Stassar
Jeff Maki
Ted Sprague
Dan Dove
Scott Kipp
Ghani Abbas
Brian Teipen
Cisco
Cisco
Dell
Alcatel-Lucent
Huawei
Juniper Networks
Infinera
Dove Networking Solutions
Brocade
Ericsson
ADVA
     
 Return to 100 Gb/s Backplane and

Return to IEEE P802.3bs Task Force Public Area

This page is maintained by

Privacy & Opting Out of Cookies


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]

Last Update: 17-Sep-2014