IEEE 802 P802

IEEE P802.3bs 200 GbE & 400 GbE Task Force


  Plenary Meeting Material
July 2017, Berlin, Germany

Meeting Materials

All Files
 23-Jul 17  (6.1M)

General Information

Agenda and General Information
 05-Jul 17 (303k)
John D'Ambrosia Futurewei, subsiary of Huawei
Chief Editor's Opening Report
 09-Jul 17 (84k)
Pete Anslow Ciena
Chief Editor's Closing Report
 11-Jul 17 (172k)
Pete Anslow Ciena
SMF Ad Hoc
 05-Jul 17 (16k)
Pete Anslow Ciena
Electrical Interface Ad hoc
 09-Jul 17 (41k)
Andre Szczepanek InPhi
IEEE 802.3 Opening Report
 05-Jul 17 (37k)
John D'Ambrosia Futurewei, subsidiary of Huawei
IEEE 802.3 Closing Report
  05-Jul 17 (143k)
John D'Ambrosia Futurewei, subsidiary of Huawei
Approved Meeting Minutes
  12-Sept 17 (152k)
John D'Ambrosia Futurewei, subsidiary of Huawei

Liaisons & Communications

OIF to IEEE P802.3bs and P802.3cd regarding progress on OIF CEI-56G-VSR-PAM4 project
Attachment (Password protected)
Nathan Tracy TE Connectivity
OIF to IEEE P802.3bs and P802.3cd regarding progress on CEI-56G-MR-PAM and CEI-56G-LR-PAM projects
Attachment 1 (Password protected)
Attachment 2 (Password protected)
Nathan Tracy TE Connectivity
Proposed Response to OIF Liaisons John D'Ambrosia Futurewei, subsidiary of Huawei

Meeting Presentations

Comments - r02-25,r02-26, r02-56, r02-57, r02-58, r02-60, r02-10. Effective Return Loss (ERL) to Limit COM Variability
  05-Jul 17 (2.2M)
Rich Mellitz Samtec
Comments - #r02-10, #r02-14, #r02-55.  Mitigating interaction problems of impedance matching between channel and Rx
   05-Jul 17 (452k)
Yasuo Hidaka Fujitsu
Comment #47 - C2M Spec Consistency and Tolerancing   
   05-Jul 17 (504k)
Johan J. Mohr
Piers Dawe
Mellanox
Comments 18 and 40 - Making the jitter specs for 400GAUI-8 and 400GBASE-DR4 compatible
  05-Jul 17 (284k)
Piers Dawe
Oded Wertheim
Mellanox
Comments 41, 44, and 45 - C2C Return Loss and Test Fixture
  05-Jul 17 (655k)
Piers Dawe Mellanox
Comments 41, 42, and 43 - C2C SNDR and SNR_ISI
  05-Jul 17 (379k)
Alexander Rysin
Piers Dawe
Mellanox
Comments 28, 36, 37: Call for a review of the SMF Optical Powers
  05-Jul 17 (359k)
Piers Dawe Mellanox
Comments R02 – 41, 44, 58: Package Impedance and Termination effect on COM (update 2)
  06-Jul 17 (681k)
Mike Dudek
Nikhil Patel
Cavium
Comments r02 -10, 14, 43, 55, 56, 57: Return Loss Specifications for C2C Tx and Rx
  06-Jul 17 (437k)
Mike Dudek
Nikhil Patel
Cavium
Late Presentation - Pr15 (Proposed Reference Equalizer Change in Clause 122.8.5.4 (Part 2)
  09-July 17 (562k)
 
Trevor Chan
Xianxu Peng Shaoyum Yi
Winston Way
NeoPhotonics
     

Last Update: 12-Sept-2017

 Return to 100 Gb/s Backplane and

Return to IEEE P802.3bs Task Force Public Area

This page is maintained by

Privacy & Opting Out of Cookies


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]