Charter: The charter of the SMF Ad hoc is to address all issues in relation to the SMF optical PMDs to assist progress towards an approved draft.
|
||
Agenda |
Pete Anslow | Ciena |
The effect of receiver bandwidth on Stressed Receiver Sensitivity |
Mike Dudek Tao Hu |
Cavium Cavium |
CWDM Wavelength Spacing |
Gary Burrell | Elenion |
Kohichi Tamura Winston Way Frank Chang Prashant Bavega Hai Feng Li Ed Ulrich |
Oclaro Neophotonics Inphi Applied Optoelectronics Intel Source Photonics |
|
Unapproved meeting notes |
Pete Anslow |
Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
D3.3 comments on SMF clauses - updated |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Marco Mazzini | Cisco | |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Updated TDECQ measurements vs Rx ref BW for T & T/2 spaced equalizers |
Brian Welch | Luxtera |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
TDECQ measurements vs Rx ref BW for T & T/2 spaced equalizers - updated |
Brian Welch | Luxtera |
Proposed Reference Equalizer Change in Clause 122.8.5.4 (Part 2) |
Winston Way Trevor Chan Xianxu Peng Shaoyun Yi |
NeoPhotonics NeoPhotonics NeoPhotonics NeoPhotonics |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Greg LeCheminant Marlin Viss |
Keysight Keysight |
|
TDECQ changes and consequent spec limits |
Jonathan King | Finisar |
Pete Anslow | Ciena | |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
TDECQ changes and consequent spec limits - updated |
Jonathan King | Finisar |
Spec changes needed for king_01_0617_smf |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
P802.3bs optical reflection limits |
Pete Anslow | Ciena |
Improved extinction ratio specifications |
Piers Dawe | Mellanox |
Jonathan King Thang Pham |
Finisar Finisar |
|
Proposed reference equalizer change in Clause 124 - updated results - updated |
Marco Mazzini Matt Traverso |
Cisco Cisco |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Baseline wander with FEC |
Pete Anslow | Ciena |
Proposed reference equalizer change in Clause 124 (TDECQ/SECQ methodologies) |
Marco Mazzini Atul Gupta |
Cisco Macom |
Captured waveforms |
Marco Mazzini | Cisco |
In support of 3.5 dB Extinction Ratio for 200GBASE-DR4 and 400GBASE-DR4 |
Piers Dawe Dazeng Feng |
Mellanox Mellanox |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda - updated |
Pete Anslow | Ciena |
Baseline wander with FEC |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
TDECQ update FrameMaker |
Jonathan King | Finisar |
53GBaud links: sensitivities and TDECQ results versus equalizer - updated |
Marco Mazzini | Cisco |
Captured waveforms |
Marco Mazzini | Cisco |
Greg LeCheminant Pavel Zivny |
Keysight Tektronix |
|
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
TDECQ update noise treatment and equalizer optimization |
Jonathan King | Finisar |
TDECQ update FrameMaker |
Jonathan King | Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
DR4 Tx 'off' specs |
Jonathan King | Finisar |
TDECQ update noise treatment and equalizer optimization |
Jonathan King | Finisar |
TDECQ update FrameMaker |
Jonathan King | Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
TDECQ processing noise treatment and equalizer optimization - updated |
Jonathan King | Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Proposed updates to TDECQ calculations for improved robustness and repeatability |
Greg LeCheminant Marlin Viss |
Keysight Keysight |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Proposed changes to TDECQ measurement process in 802.3bs clause 121.8.5 |
Greg LeCheminant | Keysight |
TDECQ equation 121-4 |
Jonathan King | Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
400GBASE-DR4 link budget discussion - updated |
Jonathan King | Finisar |
Proposed Comments Against 802.3bs Draft Specification |
Brian Welch | Luxtera |
P802.3bs D2.0 optical comments |
Pete Anslow | Ciena |
P802.3bs optical reflection limits |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
P802.3bs optical reflection limits |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
SMF comments |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
SMF power budget proposals |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
200GbE & 400GbE 2km & 10km Specifications Update Proposals - updated |
Chris Cole | Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Chris Cole Thang Pham |
Finisar Finisar |
|
Updated baseline proposals for 200GBASE-FR4 and 200GBASE-LR4 |
Peter Stassar | Huawei |
TDEC for PAM4 ('TDECQ') |
Jonathan King | Finisar |
TDEC for PAM4 ('TDECQ') - As modified after the meeting |
Jonathan King | Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
200GBASE-DR4: A Baseline Proposal for the 200G 500m Objective |
Brian Welch | Luxtera |
Baseline proposals for 200GBASE-FR4 and 200GBASE-LR4 |
Peter Stassar | Huawei |
TDEC for PAM4 - updated |
Jonathan King | Finisar |
Transmitters Compliance and Receivers Stress Sensitivity - updated |
Ali Ghiasi | Ghiasi Quantum LLC |
SSPRQ test pattern |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
200GBASE-DR4: A Baseline Proposal for the 200G 500m Objective - updated |
Brian Welch | Luxtera |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
SMF comments |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
IEEE Update: MPO-16 APC |
Tom Mitcheltree | US Conec |
Gary Nicholl | Cisco | |
SMF TBDs |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
SMF TBDs - updated |
Pete Anslow | Ciena |
Fibre_characteristics_V_4_0 |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
MPI statistical model and results - updated |
Jonathan King | Finisar |
Monte Carlo MPI spreadsheet model - updated |
Jonathan King | Finisar |
Estimating MPI Penalty |
Vipul Bhatt Benjamin Smith |
Inphi Inphi |
MPI Penalty Upper Bound Calculator |
Vipul Bhatt | Inphi |
Hai-Feng Liu | Intel | |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
802.3bs: Proposal for PAM4 PMDs link budgets harmonization - updated |
Marco Mazzini | Cisco |
400GBASE-DR4 PMD Considerations for TX OMA reduction - updated |
Marco Mazzini | Cisco |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
PAM-N modulation penalty in pictures |
Jonathan King | Finisar |
PAM4 TDEC straw-man conceptual proposal - updated |
Jonathan King | Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
SMF TBDs |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
List of required inputs for SMF Clauses 122 and 123 |
Peter Stassar | Huawei |
Jonathan King | Finisar | |
PRQS Test Patterns for PAM4 |
Ilya Lyubomirsky | Finisar |
PRQS10 characteristics |
Pete Anslow | Ciena |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
SMF BTIs |
Pete Anslow | Ciena |
400Gb/s 8x50G PAM-4 WDM 2km SMF PMD Discussion - updated |
Chris Cole | Finisar |
Updated considerations on 8x50G PAM4 for 2km duplex SMF |
Peter Stassar | Huawei |
400G-PSM4: A Proposal for the 500m Objective using 100 Gb/s per Lane Signaling |
Brian Welch Gary Nicholl Keith Conroy Jeff Maki David Lewis |
Luxtera Cisco Multi-Phy Juniper JDSU |
Ge/Si APD for PAM4 application |
Mengyuan Huang | SiFotonics |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Big Ticket Item supporting data for 10km 8x50G NRZ |
Atsushi Takai | Oclaro |
Atsushi Takai | Oclaro | |
HOM papers from OFC 2015 potentially addressing BTI - updated |
Ali Ghiasi | Ghiasi Quantum LLC |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Test plan for Big Ticket Items for PAM-4 400Gb/s SMF PMD |
Peter Stassar Xinyuan Wang Yu Xu |
Huawei Huawei Huawei |
Evaluation of Worst Case Dispersion Penalty of 50Gb/s NRZ for 10 km |
Mizuki Shirao Keisuke Kojima |
Mitsubishi Mitsubishi |
Big Ticket Items for 10km DMT |
Sacha Corbeil Ying Jiang David Lewis Brandon Collings |
JDSU JDSU JDSU JDSU |
100Gb/s/Lambda 2km PAM4 with KP4 FEC: System Modelling & The Big Ticket Items |
Alan Tipper | Semtech |
|
Chris Cole |
Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Big ticket items |
Pete Anslow | Ciena |
Clarification of dispersion requirements for PAM-N 400Gb/s Ethernet SMF PMDs |
Peter Stassar | Huawei |
Toshiki Tanaka Tomoo Takahara Hideki Isono Hisaya Sakamoto Yuji Miyaki |
Fujitsu Fujitsu Fujitsu Fujitsu Fujitsu |
|
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
SMF PMD MPI Penalty Investigation |
Chris Cole Paul Kolesar Vipul Bhatt |
Finisar Commscope InPhi |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Updated SSPR test results 8x50Gb/s PAM4 |
Peter Stassar | Huawei |
Sacha Corbeil | JDSU | |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
SMF PMD Nominal Specifications - Updated |
Chris Cole | Finisar |
Silicon Photonics PSM4 Chipset Transmitter Measurements |
Brian Welch | Luxtera |
BER-floors in 400Gb/s Ethernet SMF PMDs What are the issues? |
Peter Stassar | Huawei |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Updated Considerations on 400Gb/s Ethernet SMF PMDs - updated |
Peter Stassar | Huawei |
Optical Specifications of SMF PMDs Study |
Chris Cole | Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
Optical Specifications of SMF PMD Alternatives Study |
Chris Cole | Finisar |
Technical feasibility of 56Gbaud PAM4 optical link budget based on experimental measurements - updated |
Marco Mazzini | Cisco |
Impact of Clipping for Optical DMT |
Masato Nishihara Toshiki Tanaka Tomoo Takahara Jens C. Rasmussen |
Fujitsu Fujitsu Fujitsu Fujitsu |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
SNR Penalties of SMF PMD Alternatives (revised) |
Chris Cole | Finisar |
Approved meeting notes |
Pete Anslow | Ciena |
|
||
Agenda |
Pete Anslow | Ciena |
4x100Gb/s & 400Gb/s PMD Alternatives (revised) |
Chris Cole | Finisar |
Considerations on duplex SMF PMDs for 400Gb/s Ethernet |
Peter Stassar Xiaolu Song Yu Xu |
Huawei Huawei Huawei |
Approved meeting notes |
Pete Anslow | Ciena |
Last Update: 5-Oct 2017
Return to IEEE P802.3bs Task Force Public Area
This page is maintained by
Privacy & Opting Out of Cookies