Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_NGEPON] http://www.ieee802.org/3/ca/3ca_presentproc.shtml



(Message sent via IEEE Standards webmail)
-----------------------------------------

Presenter = Ed Harstead
Affiliation = Nokia
SenderEmail = ED.HARSTEAD@xxxxxxxxx
Title = Wavelength plan comparison: proposed decision process
Description = Simplification/replacement of wavelength plan comparison model harstead_3ca_3_1116
The decision to adopt 1+3 architectures more or less eliminated Plan C, narrowing to Plans A, B, and D.
Of the original decision criteria, only a few remained that differentiated the 3 plans.
What remains in Plans A, B, and D are two schemes for downstream and two schemes for upstream, and itâ??s more useful to take decisions for the two directions (more or less) independently
downstream plan decision: O-band vs. C-band
upstream plan decision: WDM vs. TDM co-existence with 10G EPON

Time = 30 min.


-----------------------------------------
(End of IEEE Standards webmail message)

Attachment: harstead_3ca_3_0117.pdf
Description: Binary data