Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Curtis, all,
I will bring in a contribution on 25G/50G dual rate channels if the time slot is still possible
( I hope I don’t have a problem to access the telephone meeting from the network in the other side of the pacific ocean)
Best regards
Dekun Liu
______________________________
______________________ Advanced Access Technologies Dept. 网络研究接入技术部
Huawei Technologies Co., Ltd. 华为技术有限公司
Phone: +86 027-59267217 Email: liudekun@xxxxxxxxxx湖北武汉市关山一路光谷软件园A7-9 邮编:430074
Huawei Technologies Co., Ltd.A7-9 Wuhan Optical Valley Software Park,Guan Shan Road,Wuhan,Hubei, P.R.China
From: Curtis Knittle [mailto:C.Knittle@CABLELABS.
COM ]
Sent: Monday, October 23, 2017 11:13 PM
To: STDS-802-3-NGEPON@LISTSERV.IEEE.ORG
Subject: [802.3_NGEPON] Call for agenda items -- weekly consensus building for IEEE 802.3ca (100G-EPON)
Dear Colleagues,
We have the 100G-EPON (IEEE 802.3ca) consensus building meeting scheduled for this Thursday, October 26, 11:30 am – 1:00 pm MDT. Please let me know by 5:00 pm MDT Wednesday if you have any topics for the agenda.
As a reminder from the closing report of our last F2F meeting in Charlotte, the following topics were deemed important for contributions:
- Actions:
- Power budget
- Close on 25Gbps power budget (Ed/Dekun/Umeda)
- Characterization method for both transmitter and receiver (Dekun, John J, Vincent, Junwen, Frank, Greg, Umeda-san)
- MPCP/MPRS
- Discovery process / configuration / ONU capabilities field in RegREQ (Glen Oct 12 – Glen to doodle poll)
- Fault Tolerance/Recovery/Loss of Channel
- Wavelength plan
- Peacemaker plan (Glen/Frank/Ed/Yong)
- SOA preamp/dynamic range
- Cost and feasibility still needs to be demonstrated (Dekun)
- Line coding (Postponed until after FEC decision)
- FEC information
- Comparisons of parity matrices and different FEC (Mark/Bill/Bo)
- Loud/soft ONU analysis – (Bill)
- Operating in burst mode at 1E-2 (Vincent)
- Latency (Shan)
- Define a common set of assumptions and parameters common to all FEC analyses
- Mark to send email after noodling
- SERDES/CDR
- Check margin for 10^-2 input BER (Yin, Ryan)
- 50G single wavelength
- Technical feasibility of upstream bursts (Critical path item)
- Wavelength plan
- Power budget
- Modulation
Thank you,
Curtis
Curtis Knittle
VP Wired Technologies – R&D
CableLabs
desk: +1-303-661-3851
mobile: +1-303-589-6869
Stay up to date with CableLabs: Read the blog and follow us on Twitter