Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear colleagues,
Regarding my comments #534-539, I had some offline discussion with Marek and wanted provide a few clarification points. These comments are related to two topics. Specific text revision can still be decided, but the general ideas are below.
1. MCRS_CTRL[ch].request(link_id, epam, env_length) primitive (534, 535, 536)
The issue here is when link_id is GLID, then the use of env_lenghth is incorrect. The suggestion is to use grant_length instead. The text proposal for this topic is in wey_3ca_1_0918.
2. LLID transmission over multiple MCRS channels (537, 538, 539)
The description around Fig. 143-7 can be improved. I believe it's useful to have slighly more detail about the fill order of envelopes without over-specification. After my dicussion with Marek, I agree with him that my initial text revision proposal has too much detail. I have made some improvements and uploaded wey_3ca_2a_0918. The file is attached here for convinience. The updates are highlighted in yellow.Best regards,
Shan
Jun Shan Wey 魏君珊, Ph.D.
Director, Technology Strategy and Standards
FM Product Team/Wireline Product Planning Dept./Wireline Product Operation Division
ZTE TX Inc.
11201 SE 8th St, Bellevue, WA 98004
To unsubscribe from the STDS-802-3-NGEPON list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-NGEPON&A=1
Attachment:
wey_3ca_2a_0918.pdf
Description: Binary data