| Thread Links | Date Links | ||||
|---|---|---|---|---|---|
| Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index | 
| 
 Thanks to all the presenters for squeezing their time down to 15 mins per topic. As I mentioned on the call, we won’t have a lot of time in San Diego and clearly we have a lot of inputs against a number of related topics to cover. 
 I strongly encourage everyone to reach out to the presenters or the presenters to reach out to people directly or by using the reflector to help accelerate convergence on consensus positions.  I can guarantee, if we try to
start forming that consensus on the floor in San Diego, we will not have time to get through it all. Regards,
 Mark
 On 6/27/18, 1:20 PM, "Lusted, Kent C" <kent.c.lusted@xxxxxxxxx> wrote:   In the end, I had to take desperate measures to cut out background processes from stealing
 available bandwidth; including disconnecting my email.  Hence the delayed response to this message. 
   With regards, -Kent         Just was disconnected, with a message that the meeting was cancelled.   Because we have a light agenda.     Peter Stassar,
施笪安
 Technical Director,
技术总监
 Huawei Technologies Ltd,
华为技术有限公司 European Research Center,
欧洲研究所 Herikerbergweg 36, 1101 CM Amsterdam The Netherlands Tel: +31 20 4300 832 Mob: +31 6 21146286   From:
 Lusted, Kent C [mailto:kent.c.lusted@xxxxxxxxx]
   This week’s ad hoc is proving to be quite popular for requests!  Given the need to progress consensus building prior to the plenary
 meeting on these important topics, I am extending the duration of the ad hoc this week from 90 minutes to 2 hours. 
     The proposed agenda for this week’s ad hoc is as follows:   
·        
Approve agenda 
·        
Approve 20 June 2018 ad hoc minutes 
·        
Patent reminder 
·        
http://www.ieee802.org/3/patent.html
 
·        
Participant reminder 
·        
P802.3cd TF 
·        
TF update – Mark Nowell (5 mins) 
·        
“SRS test source measurement bandwidth” – Jonathan King (25 mins) 
·        
“Is an additional TDECQ related limit needed?” – Pete Anslow (25 mins) 
·        
“Optical Link Test Results and Refinement” – Phil Sun (15 mins) 
·        
“Restoring the optical power levels for the 50GBASE-SR family” – Piers Dawe (20 mins) 
·        
“Completing the family of TDECQ-related specifications” – Piers Dawe (25 mins)     Participants on the call should be familiar with the IEEE patent policy per
http://www.ieee802.org/3/patent.html
   -Kent         To unsubscribe from the STDS-802-3-50G list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-50G&A=1
 To unsubscribe from the STDS-802-3-50G list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-50G&A=1
 To unsubscribe from the STDS-802-3-50G list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-50G&A=1  |