Meeting Materials for:
Plenary Meeting
Week of July 25th-28th, 2016
San Diego, CA
All Files
Download all meeting materials here:
Updated 21-July-2016
Last Update: 14-Sept-2016
Title | Updated | Author(s) | Affiliation |
---|---|---|---|
General Information |
|||
Agenda updated | 28-July-2016 |
Mark Nowell |
Cisco |
802.3cd Task Force Ad-hoc report | 22-July-2016 | Kent Lusted |
Intel |
802.3cd Editorial Consideration updated | 28-July-2016 | Matt Brown |
APM |
Minutes Approved |
14-Sept-2016 |
Kent Lusted |
Intel |
Liaison
Letters |
|||
ITU
Liaison |
26-May-2016 |
Steve Trowbridge |
Nokia |
OIF Informal communication | 26-May-2016 | Paul Kolesar |
Commscope |
Contributed Presentations | |||
Nomenclature Update updated | 26-July-2016 | Kent Lusted | Intel |
Continuing
discussion on “Missing objectives" updated |
26-July-2016 | Peter Stassar |
Huawei |
Architectural Support for 50/100 GbE Breakout updated | 26-July-2016 | Ali Ghiasi |
Ghiasi Quantum |
The need for 25G electrical lanes support |
21-July-2016 |
Mark Gustlin Thananya Baldwin Paul Brooks Dave Estes Martin Langhammer Mike Li Paul Mooney Jerry Pepper |
Xilinx Ixia Viavi Spirent Intel Intel Spirent Ixia |
50GE/NG100GE PCS
Consideration |
21-July-2016 | Tongtong Wang Xinyuan Wang |
Huawei Huawei |
50GE
FEC codeword alignment with 16k AM spacing |
21-July-2016 | Andre Szczepanek |
Inphi |
RS(544,514)
FEC performance including precoding |
21-July-2016 | Pete Anslow |
Ciena |
TX precoder
for 802.3cd electrical links |
21-July-2016 | Raj Hegde Magesh Valliappan |
Broadcom Broadcom |
50GbE and NG 100GbE Logic Baseline Proposal updated |
27-July-2016 |
Gary Nicholl Mark Gustlin David Ofelt |
Cisco Xilinx Juniper |
PreFEC BER Monitoring |
21-July-2016 |
David Ofelt Pete Anslow Mark Gustlin Gary Nicholl |
Juniper Ciena Xilinx Cisco |
Cl73 AN baseline proposal for 802.3cd updated | 27-July-2016 | Jeff Slavick |
Broadcom |
EEE baseline proposal for 802.3cd updated | 27-July-2016 | Jeff Slavick | Broadcom |
50GAUI-2 and 100GAUI-4 C2C and C2M Baseline Proposals for 50G and 100G Ethernets updated |
27-July-2016 |
Mike Peng Li Adee Ran Richard Mellitz Ali Ghiasi |
Intel Intel Samtec Ghiasi Quantum |
TIA-492AAAE
wideband multimode fiber spec publication |
21-July-2016 | Paul Kolesar |
Commscope |
Updated baseline proposal for the 100 Gb/s MMF objective using two-wavelength PAM4 transmission updated | 27-July-2016 | Jonathan Ingham |
Foxconn Interconnect
Technology |
Transmitter testing for MMF PMDs updated | 27-July-2016 | Jonathan Ingham | Foxconn Interconnect Technology |
Wavelength Dependence of Multimode Fiber Bandwidth & Dual Wavelength Channel Performance updated | 26-July-2016 | Rick Pimpinella Jose Castro |
Panduit Panduit |
Baseline specifications for 100G 2km and 10km SMF PMDs following 200G 2km and 10km SMF PMD specs updated | 27-July-2016 | Chris Cole |
Finisar |
100GBase-DR2: A Baseline Proposal for the 100G 500m Two Lane Objective updated | 27-July-2016 | Brian Welch |
Luxtera |
Data
center applications for 100GBase-FR objective |
21-July-2016 | Tom Palkert |
Macom |
Experimental results on single wavelength 100Gbps PAM4 modulation updated |
27-July-2016 |
Matt Traverso Marco Mazzini Atul Gupta Tom Palkert |
Cisco Cisco Macom Macom |
Baseline proposal for the 100 Gb/s SMF PHY 2 km objective using single wavelength PAM4 modulation updated |
27-July-2016 |
Dave Lewis Matt Traverso Marco Mazzini Brian Welch Mark Kimber Atul Gupta Matt Brown Gary Nicholl Ryan Yu Sudeep Bhoja |
Lumentum Cisco Cisco Luxtera Semtech Macom APM Cisco Molex Inphi |
Ethernet Adoption: SERDES Rates & Form Factors updated | 27-July-2016 | Jeffery Maki |
Juniper |
One meter measured backplane channel data updated | 27-July-2016 | Nathan Tracy |
TE |
Baseline proposals for copper twinaxial cable specifications updated | 27-July-2016 | Chris Diminico |
MC Communications |
Die/Ball Level Parameters and Channel Characteristics Annex updated | 27-July-2016 | Rich Mellitz |
Samtec |
Revisiting
MCB/HCB requirements in support 50G/lane PAM4 |
21-July-2016 | Ali Ghiasi |
Ghiasi Quantum |
PAM4 transmitter training protocol updated | 28-July-2016 | Adam Healey Jeff Slavick |
Broadcom Broadcom |
Working towards baseline COM parameters for Backplane and Direct Attach Cable updated | 28-July-2016 | Upen Reddy Kareti Adam Healey |
Cisco Broadcom |
Late
Contributions |
|||
100GbE alignment
markers |
22-July-2016 | Pete Anslow |
Ciena |