Meeting Materials for:
Interim Meeting
Week of May 23rd-25th, 2016
Whistler, BC, Canada
All Files
Download all meeting materials here:
Updated 22-May-2016
Title | Updated | Author(s) | Affiliation |
---|---|---|---|
General Information |
|||
Agenda updated | 23-May-2016 |
Mark Nowell |
Cisco |
50 Gb/s and NGOATH Ethernet Ad-hoc report updated | 23-May-2016 | Kent Lusted |
Intel |
802.3cd
Editorial Consideration |
20-May-2016 | Matt Brown |
APM |
Minutes
approved |
27-July-2016 |
Kent Lusted |
Intel |
Liaisons |
|||
Proposed Liaison to TR-42 updated | 19-May-2016 |
Paul Kolesar |
Commscope |
Contributed Presentations | |||
Nomenclature updated | 24-May-2016 | Kent Lusted | Intel |
Multi-Port Implementations of 50/100/200GbE updated | 23-May-2016 | Scott Kipp |
Brocade |
The Missing Objectives updated | 23-May-2016 | Brad Booth |
Microsoft |
50GBASE-FR
& -LR Specification Proposal |
18-May-2016 | Chris Cole |
Finisar |
Towards 50 Gb/s per lane
MMF baseline proposals updated |
23-May-2016 | Jonathan King Jonathan Ingham |
Finisar Foxconn Interconnect Technology |
Baseline proposal for the 100 Gb/s MMF objective using two-wavelength PAM4 transmission updated | 23-May-2016 | Jonathan Ingham |
Foxconn Interconnect
Technology |
100GBASE-SR2 MMF baseline proposal updated | 23-May-2016 | Jonathan King | Finisar |
RS(544,514)
FEC performance |
18-May-2016 | Pete Anslow |
Ciena |
FEC coding gain analysis in 50GE &100GbE updated | 23-May-2016 | Tongtong Wang Xinyuan Wang |
Huawei Huawei |
Architectural Consideration for 50 GbE and NG 100 GbE updated | 24-May-2016 | Ali Ghiasi |
Ghiasi Quantum |
50GbE and NG 100GbE PCS and FEC Baseline Proposals updated |
24-May-2016 |
Gary Nicholl Mark Gustlin David Ofelt |
Cisco Xilinx Juniper |
Technical considerations
for FEC Lane Distribution |
18-May-2016 | Gary
Nicholl |
Cisco |
50GAUI and CAUI C2C and C2M Baseline Proposals for 50G and Next Gen 100G Ethernet |
18-May-2016 |
Mike Peng Li Rich Mellitz Adee Ran Ali Ghiasi |
Intel Intel Intel Ghiasi Quantum |
COM
Parameter Baseline Proposal for Copper Cables updated |
24-May-2016 | Chris Roth |
Molex |
COM Analysis on Backplane and Cu DAC Channels updated | 24-May-2016 | Ali Ghiasi | Ghiasi Quantum |
TX
differential precoder for 50G/NGOATH updated |
24-May-2016 | Raj Hegde Magesh Valliappan |
Broadcom Broadcom |
PAM4
transmitter training protocol |
18-May-2016 | Adam Healey Jeff Slavick |
Broadcom Broadcom |
Baseline
proposals for copper twinaxial cable specifications |
20-May-2016 |
Chris Diminico |
MC Communications |
Late
Contribution |
|||
OTN Support for 50GbE, next generation 100GbE, and 200 GbE | 18-May-2016 | Steve Trowbridge | Nokia |
Die Level
PMD Specification |
19-May-2016 |
Rich Mellitz |
Intel |
Updated
revision to COM model com_ieee8023_93a_163 revision document.
Fixes and clarifications from 162a |
27-May-2016 |
Rich Mellitz |
Intel |
Last Update: 27-July-2016