Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Thanks to you all we prepared our PAR and CSD modifications for presubmittal to include intra system control (10Mbps backplane) applications. We unfortunately forgot to fill out the section for the reasons why we are modifying the PAR. The reasons are
already inherent in the formation of the 10BPE Study Group. I propose we include the following straightforward reasons. (Please see the January 2018 web page to see what the modified sections are at http://www.ieee802.org/3/cg/public/Jan2018/jones_10spe_10bpe_03_0118_d6.pdf )
IF YOU DISSENT, PLEASE SEND AN EMAIL BEFORE END OF DAY WEDNESDAY JAN 31.
(2.1, and 5.2b) "Project (title/scope) has been generalized to refer to balanced pairs of conductors rather than to the construction of the media (twisted pairs) to more accurately reflect the nature of the specification." (5.1)"Number of people involved has been updated based on actual attendance." (5.5) "Project need has been generalized to refer to balanced pairs of conductors rather than to the construction of the media (twisted pairs) to more accurately reflect the nature of the specification. Additionally, the need has been expanded to reflect expressed needs for intra-system control applications." (5.6) "Project stakeholders have been expanded to include end-users, system integrators, and providers of systems and components for enterprise and data center networking who have expressed interest in the project for intra-system control applications." George A. Zimmerman, Ph.D.
CME Consulting, Inc.
Experts in PHYsical Layer Communications
310-920-3860
|