Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Thank you all for a productive meeting. We resolved the relevant comments, and prepared a new timeline. The website has been updated with the presentations as given, and with the new timeline.
I have uploaded the comment reports as well (to the comments area) showing the resolved comments on draft 1.3, and our editorial team is checking the already implemented comments and I have uploaded a preview of draft 2.0 along with a compare
to draft 1.3. We are currently checking for correctness. If you wish to help, it will be appreciated. Please no new comments – just trying to catch anything we may have mis-edited which are needed to have technical completeness. George A. Zimmerman, Ph.D. Chair, IEEE P802.3cg 10Mbps Single Pair Ethernet Task Force President & Principal Consultant CME Consulting, Inc. Experts in PHYsical Layer Communications 1-310-920-3860 To unsubscribe from the STDS-802-3-10SPE list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-10SPE&A=1 |