Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Thank you to all those who came to the off cycle interim. The ballot resolution committee considered 128 comments, and prepared responses to all of them. the comment reports are now posted in the comments area of our website, along with
unsatisfied comments from 2 commenters. (1 unsatisfied, 25 not-satisfied, as the commenter wasn’t at the meeting and hasn’t had a chance to respond yet). The reports can be found at:
http://www.ieee802.org/3/cg/comments/index.html Valerie Maguire and the editorial team are working quickly and efficiently for a recirculation of the draft, which I hope will be our last before proceeding to sponsor ballot. Thank you all for your hard work, diligence, and reviews of the drafts. -george George A. Zimmerman, Ph.D. Chair, IEEE P802.3cg 10Mbps Single Pair Ethernet Task Force President & Principal Consultant CME Consulting, Inc. Experts in PHYsical Layer Communications 1-310-920-3860 To unsubscribe from the STDS-802-3-10SPE list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-10SPE&A=1 |