Meeting Materials |
||
All Files 21-Nov 18 (5.7M) |
||
General Information |
||
Agenda and General Information 12-Nov 18 (504k) |
John D'Ambrosia | Futurewei, subsiary of Huawei |
IEEE 802.3 Opening Plenary Report 07-Nov 18 (85k) |
John D'Ambrosia | Futurewei, subsiary of Huawei |
IEEE 802.3 Closing Plenary Report 06-Nov 18 (261k) |
John D'Ambrosia | Futurewei, subsiary of Huawei |
Motions 13-Nov 18 (190k) |
John D'Ambrosia | Futurewei, subsidiary of Huawei |
Approved Meeting Minutes
18-Jan 19 (364k) |
John D'Ambrosia | Futurewei, subsidiary of Huawei |
Liaisons & Communications |
||
COBO to IEEE 802.3 on specification availability | ||
ITU-T SG15 to IEEE 802.3 regarding SG15 work on G.709.3 and G.698.2 Attachments (Password protected) | ||
OIF to IEEE 802.3 regarding 400ZR Interop Project Attachment (Password protected) | ||
Meeting Presentations |
||
PMD Naming 06-Nov 18 (23k) |
Pete Anslow | Ciena |
Overview of (editing) work required to
create physical layer specifications for n*50G PAM4 over 40 km 07-Nov 18 (33k) |
Peter Stassar | Huawei |
Baseline Proposal for 50 Gb/s Ethernet 40km
SMF, 50GBASE-ER in 802.3cn 12-Nov 18 (249k) |
Yu Xu Kenneth Jackson Hai-feng Liu Frank Chang Shiyu Li |
Huawei Technologies Sumitomo Intel Source Photonics Accelink |
Baseline Proposal
for 200 Gb/s Ethernet 40km SMF, 200GBASE-ER4 in
802.3cn 12-Nov 18 (253k) |
Yu Xu Kenneth Jackson Hai-feng Liu Frank Chang Shiyu Li |
Huawei Technologies Sumitomo Intel Source Photonics Accelink |
400GBASE-ER8
40km SMF PMD Preliminary Specification Proposal 12-Nov 18 (1.1M) |
Frank
Chang Xinyuan Wang Hai-feng Liu |
Source
Photonics Huawei Technologies Intel |
Introducing
the ITU-T SG15 Liaison Statement with the
recently consented revised Recommendation
G.698.2 clarifying the specification methodology
for 100 Gb/s coherent DWDM systems 12-Nov 18 (33k) |
Peter
Stassar Pete Anslow |
Huawei
Technologies Ciena |
Considerations
on establishing physical layer specifications
for 100 Gb/s and 400 Gb/s over 80 km DWDM
systems 12-Nov 18 (30k) |
Peter
Stassar Pete Anslow |
Huawei
Technologies Ciena |
OSNR Link
Budget Methodology 11-Nov 18 (556k) |
Ilya Lyubomirsky | Inphi Corp. |
Baseline
Proposal for 400G/80km 11-Nov 18 (772k) |
Ilya
Lyubomirsky Jamal Riani Ben Smith Sudeep Bhoja Rich Baca |
Inphi
Corp. Inphi Corp. Inphi Corp. Inphi Corp. Microsoft |
Coherent 100
and 400G PMD Layer WDM considerations 12-Nov 18 (1.5M) |
John
DeAndrea Zhe Li |
Finisar |
Potential
Splitting of P802.3cn PAR – Project Targeting
“40km over SMF” Related Objectives 12-Nov 18 (128k) |
John D'Ambrosia | Futurewei, subsidiary of Huawei |
Potential
Splitting of P802.3cn PAR – Project Targeting
“80km over DWDM Systems” Related Objectives 12-Nov 18 (247k) |
John D'Ambrosia | Futurewei, subsidiary of Huawei |
Late Presentations |
||
P802.3cn optical reflection limits 11-Nov 18 (90k) |
Pete Anslow | Ciena |
Motivation for a 100GBE CGMII Extender 12-Nov 18 (439k) |
Shawn Nicholl Gary Nicholl |
Xilinx Cisco |
Proposed
P802.3cn PAR Modification 13-Nov 18(8k) |
David Law | HPE |
Proposed
P802.3ct PAR 13-Nov 18(8k) |
David Law | HPE |
Last Update: 21-Nov-2018
Return to IEEE P802.3cn Task Force Public Area
This page is maintained by
Privacy & Opting Out of Cookies