Joint IEEE P802.3cn / P802.3ct Task Force Meeting

IEEE 802.3 Sept 2019 Interim


Meeting Materials

All Files
   10-Sept-19 (3.1M)

General Information

Agenda and General Information
     06-Sept-19 (626K)
John D'Ambrosia Futurewei, U.S. Subsiary of Huawei
IEEE P802.3cn Chief Editor's Opening Report
    06-Sep-19 (111K)
Pete Anslow Ciena
IEEE P802.3cn Chief Editor's Closing Report
    11-Sep-19 (236K)
Pete Anslow Ciena
IEEE P802.3ct Chief Editor's Report
    10-Sep-19 (113K)
Tom Issenhuth Huawei
Motions and Strawpolls
   11-Sep-19 (164K)
John D'Ambrosia Futurewei, U.S. Subsiary of Huawei
Unapproved Meeting Minutes
    12-Sep-19 (224K)
John D'Ambrosia Futurewei, U.S. Subsiary of Huawei

Liaisons & Communications

OIF to IEEE 802.3 regarding progress on OIF 400ZR project
Attachment (Password protected)
     Proposed Liaision to OIF and ITU-T SG15 
     11-Sep-19 (104k)
   
      Proposed Liaision to ITU-T SG15 
     11-Sep-19 (102K)

Presentations

   
Manufacturer Input on Frequency Range
     10-Sept-19 (647k)
Matt Schmitt CableLabs
75 GHz Filter Data in support of 64 channel 400G Base ZR Links
     09-Sept-19 (167k)
John DeAndrea Finisar
Impact of channel count of PMD Clause 154 on black link design and volume manufacturing
     10-Sept-19 (661k)
John DeAndrea Finisar
Impact of 75 GHz filters on 400BASE-ZR black link, 80 km requirement
     09-Sept-19 (311k)
John DeAndrea Finisar
75-GHz spacing for 400G Ethernet over DWDM for DCI
     11-Sept-19 (423k)
Liang Du
Tad Hofmeister
Rich Baca
Google
Google
Microsoft
Update: Summary Splitting IEEE P802.3ct Project - Proposed Project Documentation Packages
     04-Sept-19 (174k
John D'Ambrosia Futurewei, U.S. Subsidiary of Huawei
Update: Proposed Draft PAR Responses - 100 GbE over DWDM PHY Objectives
     04-Sept-19 (128k)
John D'Ambrosia Futurewei, U.S. Subsidiary of Huawei
Update: Proposed CSD Responses: 100 GbE over DWDM Project (IEEE P802.3ct) Objectives
     04-Sept-19 (257k)
John D'Ambrosia Futurewei, U.S. Subsidiary of Huawei
Update: Draft PAR Responses: 400 GbE over DWDM PHY Objectives Proposed IEEE 802.3cw Project
     04-Sept-19 (126k)
John D'Ambrosia Futurewei, U.S. Subsidiary of Huawei
Update: Proposed CSD Responses: - 400 GbE over DWDM Project (IEEE P802.3cw) Objectives
     04-Sept-19 (258k)
John D'Ambrosia Futurewei, U.S. Subsidiary of Huawei

Proposed PARs

   
Proposed Modified PAR - IEEE P802.3ct
     11-Sep-19 (8k)
   
Proposed PAR - IEEE P802.3cw
     11-Sep-19 (8k)
   

Last Update: 12-Sep-2019


Return to IEEE P802.3ct Task Force Public Area

This page is maintained by

Privacy & Opting Out of Cookies


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]