Meeting Materials |
||
All Files 22-Nov 19 (4.5M) |
||
General Information |
||
Agenda and General Information 14-Nov 19 (670k) |
John D'Ambrosia | Futurewei, U.S. Subsiary of Huawei |
IEEE
P802.3ct Chief Editor's Opening Report 06-Nov 19 (79k) |
Tom Issenhuth | Huawei |
IEEE
P802.3ct Chief Editor's Closing Report 14-Nov 19 (132k) |
Tom Issenhuth | Huawei |
IEEE 802.3 Opening Report 06-Nov 19 (130k) |
John D'Ambrosia | Futurewei, U.S. Subsiary of Huawei |
IEEE 802.3 Closing Report 14-Nov 19 (308k) |
John D'Ambrosia | Futurewei, U.S. Subsiary of Huawei |
802.3ct
D1.0 Comment Resolution Agenda 12-Nov 19 (95k) |
Tom Issenhuth Peter Stassar Steve Trowbridge |
Huawei Huawei Nokia |
Consideration of comments submitted against IEEE
P802.3ct / P802.3cw PARs 13-Nov-2019 (163k) |
John D'Ambrosia | Futurewei, U.S. Subsiary of Huawei |
Updated IEEE
P802.3ct PAR 13-Nov 19 (48k) |
David Law | HPE |
IEEE P802.3ct Motions and Strawpolls 14-Nov 19 (143k) |
John D'Ambrosia | Futurewei, U.S. Subsiary of Huawei |
Approved Meeting Minutes 28-Jan 20 (237k) |
John D'Ambrosia | Futurewei, U.S. Subsiary of Huawei |
Liaisons & Communications |
||
ITU-T SG15: 100 Gbit/s and 400 Gbit/s DWDM issues 20 | ||
OIF to IEEE P802.3ct regarding progress on OIF
400ZR project Attachment (Password protected) |
||
Proposed Liaison to ITU-T, RE: IEEE P802.3ct
D1.1 14-Nov-2019 (103k) |
||
Presentations |
||
Comments 14 -
15, Bit-error monitoring for FEC protected interfaces 06-Nov-2019 (282k) |
Eric Maniloff | Ciena |
Comments
-47, 48, 49, 51, 53, 56: Terminology Input
06-Nov-2019 (268k) |
John D'Ambrosia | Futurewei, U.S. Subsiary of Huawei |
In support of
Clause 154, Table 154.8, Transmitter Parameters,
100GBASE ZR 10-Nov-2019 (260k) |
John DeAndrea | II-VI |
Filling in
Clause 153 TBDs 06-Nov-2019 (165k) |
Steve Trowbridge Ilya Lyubomirsky |
Nokia Inphi |
Suggestion on
grid spacing of 400GbE 22-Nov-2019 (127k) |
Song Chen ChengBin Wu |
ZTE |
400GBASE-ZR EVM
Pass/Fail Criteria 20-Nov-2019 (1.1M) |
Yi Weng Konstantin Kuzmin Winston Way |
NeoPhotonics |
75GHz-spaced
MUX/DMUX Test Results Based on 3-Channel
400GBase-ZR Signals 12-Nov-2019 (895k) |
Yi Weng Konstantin Kuzmin Winston Way |
NeoPhotonics |
Late Presentations |
||
75GHz
rectangular AWG for 400G-ZR without Nyquist
shaping 06-Nov 2019 (212k) |
Daisuke Ogawa | NTT Electronics |
In Support of
Comment #9 07-Nov-2019 (708k) |
Leon Bruckman | Huawei |
Last Update: 28-Jan-2020
Return to IEEE P802.3ct Task Force Public Area
This page is maintained by
Privacy & Opting Out of Cookies