Meeting administration |
|||
May 2023 Meeting Agenda | Yuanqiu Luo | Futurewei | |
May 2023 Meeting Agenda with Motions | Yuanqiu Luo | Futurewei | |
April 2023 approved Minutes | Frank Effenberger | Futurewei | |
May 2023 unapproved Minutes | Frank Effenberger | Futurewei | |
Liaison |
|||
ITU-T LS/r on 100 Gb/s bidirectional point-to-point optical access | ITU-T Study Group 15 | Attachment | Response letter |
ITU-T LS on G.652 fibre link property | ITU-T Study Group 15 | Attachment | Response letter |
Presentations |
|||
Considerations on BR40 wavelength plan | Han Hyub Lee Hwan Seok Chung |
ETRI | |
Wavelength plan for 100G and 200G Bidi optical PMDs targeting 10km and 20km reach | Peter Stassar Guangcan Mi Tao Gui |
Huawei | |
Multipath interference in high-speed PAM4 transmission | Dawei Ge Dong Wang Ruibo Han Dechao Zhang Ning Cheng |
China Mobile Innolight Technology |
|
Impact of MPI on high-speed PAM4 transmission | Ning Cheng Dawei Ge Dong Wang Dechao Zhang |
Innolight Technology China Mobile |
|
MPI and its relationship to P802.3dk | Frank Effenberger | Futurewei | |
Return to the IEEE P802.3dk Greater than 50 Gb/s Bidirectional Optical Access PHYs Task Force Home Page
Last Update: 18 May 2023