Ron,

Ron McConnell wrote:
> ... The usual target for remote terminals is to operate
> for 8 hours during commercial power failures.
The requirement in Germany we used in the mid nineties
was 4 hours for fibre-based as well as for hybrid
fibre-coax access systems.

> I have the notion outside plant located
> carrier terminals are not common in Germany.
About 10% of the customers (4 millions) in Germany are
connected via a hybrid access network called Hytas (an
Alcatel product). I guess there are another 2-4 millions
connected via other systems.

Thomas
-- 
Thomas M. Bossmeyer             Mint Technology            +-----+
Senior Systems Engineer         LSI Logic GmbH          LSI|LOGIC|
Phone: +49 711 139 69-23        Ingersheimer Str. 20       |     |
Fax:   +49 711 866 14 28        70499 Stuttgart            +-----+
mailto:bossm@xxxxxxxx           Germany      http://www.lsilogic.com
begin:vcard 
n:Bossmeyer;Thomas
tel;fax:+49 711 8661428
tel;work:+49 711 13969-23
x-mozilla-html:FALSE
url:www.lsil.com
org:LSI Logic;Mint Technology
adr:;;Ingersheimer Str. 20;Stuttgart;;70825;Germany
version:2.1
email;internet:bossm@xxxxxxxx
title:Senior Systems Engineer
fn:Thomas Bossmeyer
end:vcard