Attached is a proposed test methodology from Meir Bartur of Zonu
measure the distance improvement in MPN limited links achievable with a
low line BER's (approx. 10E-4). This low BER will be corrected
by the proposed frame FEC scheme to 10E-12.
We will discuss this test on tomorrow's conference call.