Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_DIALOG] IEEE P802.3bw 100BASE-T1 2nd IEEE 802.3 Working Group recirculation ballot results



Dear Colleagues,

The 2nd IEEE 802.3 Working Group recirculation ballot on the amendment IEEE P802.3bw 100BASE-T1 closed successfully on 1st April 2015. The ballot exceeded the required 75% for consensus to approve the draft. The April 2015 IEEE P802.3bw Task Force interim meeting <http://www.ieee802.org/3/interims/index.html> will consider the 33 comments submitted and determine changes to the draft as appropriate. The availability of the comment database has been announced on the IEEE P802.3bw Task Force reflector.

The ballot statistics are:

 266 Voters
 110 Approve
   3 Disapprove 
  37 Abstain
 150 Ballots returned

 56.39% Response Rate (> 50% required)
 24.67% Abstain Rate (< 30% required)
 97.35% Approval Rate (>= 75% required)

Thank you to all that participated in this ballot. 

David Law
Chair, IEEE 802.3 Ethernet Working Group

Thomas Hogenmüller
Chair, IEEE P802.3bw 100BASE-T1 Task Force