The 1st Sponsor recirculation ballot on the amendment IEEE P802.3bt DTE Power via MDI over 4-Pair closed successfully on 23rd October 2017. The ballot exceeded the required 75% for consensus to approve the draft. The November 2017 IEEE P802.3bt Task Force plenary week meeting <http://www.ieee802.org/3/interims/index.html> will consider the 474 comments submitted and determine changes to the draft as appropriate. The availability of the comment database will be announced on the IEEE P802.3bt Task Force reflector.

An additional 10 comments were received after the ballot closed, these comments will be marked as 'late' in the comment report and will be considered by the IEEE P802.3bt Task Force if, based on a vote if necessary, there is no objection to do so.

The ballot statistics are:

 114 Voters
  81 Approve
  14 Disapprove 
   1 Abstain
  96 Ballots returned

 84% Response Rate (>= 75% required)
  1% Abstain Rate (< 30% required)
 85% Approval Rate (>= 75% required)

Thank you to all that participated in this ballot. 