Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_DIALOG] IEEE P802.3 (IEEE 802.3cj) Maintenance #12 (revision) 2nd Sponsor recirculation ballot results



Dear Colleagues,

The 2nd Sponsor recirculation ballot on the Revision IEEE P802.3 (IEEE 802.3cj) Maintenance #12 (revision) closed successfully on 27th March 2018. The ballot exceeded the required 75% for consensus to approve the draft. The Friday 6th April 2018 IEEE P802.3 (IEEE 802.3cj) Task Force teleconference interim meeting <http://www.ieee802.org/3/interims/index.html> will consider the 12 comments submitted and determine changes to the draft as appropriate. The availability of the comment database will be announced on the IEEE P802.3 (IEEE 802.3cj) Task Force reflector.

The ballot statistics are:

 147 Voters
 119 Approve
   3 Disapprove 
   8 Abstain
 130 Ballots returned

 88% Response Rate (>= 75% required)
  6% Abstain Rate (< 30% required)
 97% Approval Rate (>= 75% required)

Thank you to all that participated in this ballot. 

David Law
Chair, IEEE 802.3 Ethernet Working Group

Adam Healey
Chair, IEEE P802.3 (IEEE 802.3cj) Maintenance #12 (revision) Task Force

________________________________________________________________________
To unsubscribe from the STDS-802-3-DIALOG list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-DIALOG&A=1