Re: [802.3_EPOC] IEEE P802.3bn Call for Presentations for Geneva meeting
Hi Jorge,
This actually brings up a good topic for everyone. We had numerous presentations in the Study Group that contained material that might be applicable for continued consideration by the Task Force for developing evaluation criteria, functional requirements, channel model and scenario parameters, aspects of technical requirements, etc. These are available in the Study Group Area at our new home page (or via the previous Study Group URL):
http://www.ieee802.org/3/bn/
Below is an example list of some previous contributions overviewing MSO operations and requirements. Reviewing these and any other previous presentations is a decision for each member. If someone feels that there is relevant material for the Task Force, they can decide what they want to bring forward via a new contribution.
Cheers,
Mark
Acting Chair
IEEE P802.3bn Task Force
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Evaluation Criteria
http://www.ieee802.org/3/epoc/public/jan12/schmitt_01_0112.pdf
A high level perspective on EPoC requirements
http://www.ieee802.org/3/epoc/public/jan12/noll_01_0112.pdf
MSO Topology Scenarios
http://www.ieee802.org/3/epoc/public/mar12/mallette_01_0312.pdf
Operating conditions under which EPoC is expected to work
http://www.ieee802.org/3/epoc/public/mar12/noll_01a_0312.pdf
China NG HFC Key Requirements
http://www.ieee802.org/3/epoc/public/mar12/huang_01_0312.pdf
From: Salinger, Jorge [mailto:Jorge_Salinger@xxxxxxxxxxxxxxxxx]
Sent: Thursday, September 06, 2012 6:25 PM
To: Mark Laubach; stds-802-3-epoc@xxxxxxxxxxxxxxxxx
Subject: Re: [802.3_EPOC] IEEE P802.3bn Call for Presentations for Geneva meeting
Mark,
I think I understand, although I'm not sure I quite follow which are the "previous contributions in the Study Group phase discussing issues related to the proposal and consideration of additional evaluation criteria" from your note below. Would you mind providing an example of such contributions proposing additional evaluation criteria?
Thanks Mark!
Jorge
From: Mark Laubach <laubach@xxxxxxxxxxxx<mailto:laubach@xxxxxxxxxxxx>>
Reply-To: Mark Laubach <laubach@xxxxxxxxxxxx<mailto:laubach@xxxxxxxxxxxx>>
Date: Thursday, September 6, 2012 5:35 PM
To: EPoC Study Group <STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx<mailto:STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx>>
Subject: Re: [802.3_EPOC] IEEE P802.3bn Call for Presentations for Geneva meeting
Hi Jorge and all,
Our approved Objectives along with our PAR and 5Criterial define the technical requirements for our standard development process. As part of the Task Force draft completeness review, we will be asking ourselves "have we met our Objectives?" (as well as the PAR, the 5Criteria, and any other adopted evaluation criteria) before requesting approval for Working Group ballot. Recall that the Objectives are a commitment between a Task Force and the 802.3 Working Group.
Aspects of the Objectives and any other evaluation criteria will be reflected in some manner in our work; i.e. the Task Force draft will define a set of technical requirements that are to be met by future products that claim conformance with the approved standard. Following that, technical requirements that influence conformance are much more related to our technical selection consensus process for building the Baseline, as Marek overviewed.
There are previous contributions in the Study Group phase discussing issues related to the proposal and consideration of additional evaluation criteria. I think this topic area is more central to the original question. The Call For Presentations for the upcoming meeting also highlights the need for contribution in these areas.
Cheers,
Mark
Acting Chair
IEEE P802.3bn
From: Marek Hajduczenia [mailto:marek.hajduczenia@xxxxxx]
Sent: Thursday, September 06, 2012 5:29 AM
To: STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx<mailto:STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx>
Subject: Re: [802.3_EPOC] IEEE P802.3bn Call for Presentations for Geneva meeting
Jorge,
You're 100% right on target there - since the group developing both sides (first Objectives and then Baseline Proposals) is typically the same, we do not need any intermediate steps. We move directly to baselines and start developing actual the product (standard draft). I understand now the context of your question in the first email :)
Regards
Marek
From: Salinger, Jorge [mailto:Jorge_Salinger@xxxxxxxxxxxxxxxxx]<mailto:[mailto:Jorge_Salinger@xxxxxxxxxxxxxxxxx]>
Sent: Thursday, September 06, 2012 12:32
To: STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx<mailto:STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx>
Subject: Re: [802.3_EPOC] IEEE P802.3bn Call for Presentations for Geneva meeting
Thanks Marek!
I guess I should have explained myself a bit better. I understand the purpose of the Baseline Proposals, and I am working on a few with some TF colleagues. And I understand the purpose of the Objectives as I worked on them. To mirror terms used in general during the product or service development process, I see the Objectives as being product requirements, and I see the Baseline Proposals as being the design. I was wondering about a step in the middle, between what I call product requirements (the Objectives) and the design (the Baseline Proposals) which I would call the technical requirements. This intermediate phase would define what needs to be designed in more detail than the product requirements would.
But, I guess from the answer from Marek below, which I consider to be an expert in the IEEE 802 and 802.3 processes, I guess the answer is no, there isn't any requirements in between the Objectives and the Baseline Proposals. Please correct me if I misunderstood.
I guess this makes sense since it is the same group that develops the Objectives and the Baseline Proposal. On the product or service development side the product requirements come from a different organization than the one that would do the design and development of the product or service, so the technical requirements are necessary to properly define the requirements.
So, we can directly jump to Baseline Proposals from the Objectives, which is good. Saves time, which is great.
Thanks!
Jorge
From: Marek Hajduczenia <marek.hajduczenia@xxxxxx<mailto:marek.hajduczenia@xxxxxx>>
Date: Thursday, September 6, 2012 2:14 AM
To: "Salinger, Jorge" <Jorge_Salinger@xxxxxxxxxxxxxxxxx<mailto:Jorge_Salinger@xxxxxxxxxxxxxxxxx>>, EPoC Study Group <STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx<mailto:STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx>>
Subject: RE: [802.3_EPOC] IEEE P802.3bn Call for Presentations for Geneva meeting
Hi Jorge,
Since you asked "all" as well ... It is typical for any project to establish what is called "baseline proposals", covering a set of technical agreements and requirements that the given device under specification must meet. Here are some examples of baseline proposals from other projects:
• P802.3av (among the others, more available at http://www.ieee802.org/3/av/public/baseline.html):
– "802.3av shall not support a physical XAUI interface between PHY and MAC in the ONU."
– "There shall be a Broadcast MAC instance for 10G distinct from the 1G Broadcast MAC instance"
– "10GEPON shall accommodate FEC's parity bandwidth by reducing the MAC's effective data rate (sub-rating)."
• P802.3bf:
– "Adopt slide 7 from law_1_0110.pdf<http://www.ieee802.org/3/bf/public/1001/law_1_0110.pdf> as the baseline architecture"
• P802.3bj:
– "Move that the following be adopted as baseline proposals:
- dudek_03_0312.pdf<http://www.ieee802.org/3/bj/public/mar12/dudek_03_0312.pdf> for the 12.9GHz-related objective
- brown_01a_0312.pdf<http://www.ieee802.org/3/bj/public/mar12/brown_01a_0312.pdf> (excluding slides 4 and 26) and brown_02_0312.pdf<http://www.ieee802.org/3/bj/public/mar12/brown_02_0312.pdf> for the 7.0GHz related objective"
Is this what you mean by "technical requirements"? If so, I believe we have mechanism already in place to establish those - all we need is proposals, discussion at the meeting and eventually - a vote to approve these. Howard described this process already in some detail in http://www.ieee802.org/3/epoc/public/jul12/frazier_02_0712.pdf presented at the last meeting.
Regards
Marek
From: Salinger, Jorge [mailto:Jorge_Salinger@xxxxxxxxxxxxxxxxx]
Sent: Thursday, September 06, 2012 01:24
To: STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx<mailto:STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx>
Subject: Re: [802.3_EPOC] IEEE P802.3bn Call for Presentations for Geneva meeting
Mark and All,
I have a question of technical organizational nature...
Is it necessary and customary to establish technical requirements for a project once a Task Force is established? I know we have the Objectives, but I see those as product requirements versus technical requirements.
If so, I suppose that we could/should start doing that during this next meeting, would you agree?
Thanks!
Jorge
From: Mark Laubach [mailto:laubach@xxxxxxxxxxxx]<mailto:[mailto:laubach@xxxxxxxxxxxx]>
Sent: Wednesday, September 05, 2012 01:40 AM
To: STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx<mailto:STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx> <STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx<mailto:STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx>>
Subject: [802.3_EPOC] IEEE P802.3bn Call for Presentations for Geneva meeting
Dear Members of the IEEE P802.3bn Task Force,
We will be meeting for two days during the September IEEE 802.3 interim
meeting at the ITU in Geneva, Switzerland, September 27th and 28th.
Anyone who would like to deliver a presentation at the meeting is
advised to read the "Procedure for Presenters", found at:
http://www.ieee802.org/3/bn/public/presentproc.html
You will need to send me a request for presentation time no later than
September 14th, and a PDF file of the presentation (in English) no later
than Tuesday, September 18th.
As we've now entered the Task Force phase, a growing percentage of
presentations should focus on incrementally building broad consensus and
support for technical selections that meet our PAR, Objectives and Criteria,
including developing our Channel Model, and any other evaluation criteria that
will be used by the TF for Baseline selection purposes, and as well as on the
co-existence of FDD and TDD.
As this is the first meeting of the Task Force, please expect the first portion
of the agenda to review IEEE SA, 802, and 802.3 processes for getting to an
approved standard as well as some preparatory information on the email
distribution list in the near future. In addition, before the close of the
meeting we will need to adopt a Task Force Timeline.
I look forward to seeing you in Geneva.
Mark Laubach
Acting Chair
IEEE 802.3bn Task Force
Broadband Communications Group
Broadcom Corporation
1351 Redwood Way
Petaluma, CA, 94954
[Description: Description: Description: broadcom.jpg]
Tel: +1.707.792.9093
Cell: +1.650.996.2219
________________________________
<="" p="">
________________________________
________________________________
________________________________
<="" p="">
________________________________
<="" p="">
________________________________________________________________________
To unsubscribe from the STDS-802-3-EPOC list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-EPOC&A=1