Re: [STDS-802-3-EPOC] RF Spectrum Call
Hi Steve,
A number of us will be unavailable for a call next Tuesday for the same
reason we won't be available next Monday - an alternate forum EPoC F2F
meeting.
Regards,
Bill
-------- Original Message --------
Subject: [STDS-802-3-EPOC] RF Spectrum Call
Date: Tue, 13 Aug 2013 18:10:49 +0000
From: Shellhammer, Steve <sshellha@xxxxxxxxxxxxxxxx>
Reply-To: Shellhammer, Steve <sshellha@xxxxxxxxxxxxxxxx>
To: <STDS-802-3-EPOC@xxxxxxxxxxxxxxxxx>
All,
Our appointment for the RF Spectrum Ad Hoc call fell off
the calendar so we did not have one this week.
I will send out an appointment for next Tuesday. The
following Tuesday I have a conflict.
We have a few possible open issues which we identified
last week. I am open to presentation on these topics next week or in
York. Most of these topics require presentation material. We can
discuss a few of these next week even if we do not have any presentation
material.
In my opinion, we can complete this Ad Hoc at the York
meeting and only hold future meetings when topics come up.
*Open Items*
·Potential change of FDD upstream lower band edge from 10 MHz to 5 MHz.
A proposal may be given in the future
·FDD operation above 1212 MHz up to possibly 2610 MHz needs to be
studied. This will begin with a channel model study in the Channel
Model Ad Hoc.
·Need to decide if there will be TDD operation between 277 and 750 MHz
(See technical decisions 73, 85 and 86)
·Does PHY need to cover full FDD range (US and DS)? Need informative
text for conformance to frequency ranges.
·Does PHY need to cover both TDD bands?
Steve
------------------------------------------------------------------------
________________________________________________________________________
To unsubscribe from the STDS-802-3-EPOC list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-EPOC&A=1