Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Colleagues, Using the recently published DOCSIS 3.1 PHY specification (CM-SP-PHYv3.1-I01-131029) as a guide, Saif Rahman and I have put together proposal text for the EPoC downstream electrical output/input requirements. Much of this content was contributed and reviewed in that forum by Tom Kolze. We reviewed these at a high level during the EPoC PHY Ad Hoc meeting today and intend to bring these to Dallas as a baseline proposal. Please find that document attached. I have added document comments that detail which sections of the D3.1 PHY specification the content is based upon and whether that content is new to EPoC (not yet covered by a technical motion) or if based on already motioned and accepted technical proposals. You will notice that some of the larger tables contain a mix of both. We are working on a similar document for the Upstream which we hope to have ready for a high level review for next week's EPoC PHY Ad Hoc meeting. Please review and feel free to reply to the reflector with questions or comments. j Joe Solomon Comcast - T & P Access Technology 303-242-7037 [cid:image001.png@01CDE9BB.95EA0330] ________________________________________________________________________ To unsubscribe from the STDS-802-3-EPOC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-EPOC&A=1
Attachment:
Rahman-EPoC - DS Electrical Requirements-103013.docx
Description: Rahman-EPoC - DS Electrical Requirements-103013.docx