[STDS-802-3-EPOC] Scheduling Probes period usage
In San Diego we consolidated Probes, PHY Discovery Response and Fine Ranging in the same freq/time band (5-6 symbols at the beginning of the US frame which is 261-262 symbols long. I've been mulling over how we might want ot schedule use of the Probing band and was wondering if anyone else has given this any thought?
Best Regards,
Duane
FutureWei Technologies Inc.
duane.remein@xxxxxxxxxx
Director, Access R&D
919 418 4741
Raleigh, NC
________________________________________________________________________
To unsubscribe from the STDS-802-3-EPOC list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-EPOC&A=1