Re: [HSSG] Data Centre Cabling Lengths



Matt,

Firstly, apologies for the delay in my response. Hugh's reply covers it
well (thanks Hugh!):

"The survey covers "installed" cable, it doesn't cover patch cords and
equipment cables. The connections to a top of rack switch (or to a top of
rack patch panel) are not included. The copper PMD objective will cover the
connections that you describe and other connections that are currently made
by using "loose" cables."

Best regards,   Alan