Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Matt, Firstly, apologies for the delay in my response. Hugh's reply covers it well (thanks Hugh!): "The survey covers "installed" cable, it doesn't cover patch cords and equipment cables. The connections to a top of rack switch (or to a top of rack patch panel) are not included. The copper PMD objective will cover the connections that you describe and other connections that are currently made by using "loose" cables." Best regards, Alan