Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear Members of the HSSG, Given the events of last week, as an 802.3 Study Group, we
now find ourselves in a precarious position. With the failure to get a PAR / 5 criteria approved at last
week’s interim meeting, we must now worry about gaining approvals for
extension of the study group life. At this point the SG has been given
two extensions. The third extension in July was intended to cover the SG
while the PAR / 5 Criteria went through the cycle of approval at 802EC, NesCom,
and the IEEE-SA Standards Board. As the situation now is, the third
extension is needed to extend the lift of the SG, and a fourth extension would
be requested at the November meeting to cover the approval process at 802EC,
NesCom, and the IEEE-SA Standards Board in the November / December
timeframe. It is unprecedented for a SG to get four extensions, and at
the last meeting, a number of individuals were already speaking against a third
extension if no forward progress was made by the SG by the end of the July
meeting. I will be pushing for the SG to finalize and approve its
recommendations regarding PAR(S) and respective 5 Criteria responses at the
July meeting. Assuming the SG can progress this far, we can then present
these recommendations to the 802.3 Working Group for approval at the July
Plenary. This would then allow us to pre-submit the SG recommendations to
the 802 EC in July for consideration at the November meeting, which would help
strengthen the SG’s requests for extensions at the July and November
meetings. Please keep this in mind between now and the July
Plenary. The ability of this study group to reach consensus regarding a
PAR or PARs on the 40G / 100G issue will be dependent upon its members. All must work together to drive towards a consensus
position or the future of this group is clearly in doubt. John D’Ambrosia Chair, IEEE 802.3 Higher Speed Study Group |