Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Hi Bob, While it would be much less work
for me to do such editorial changes with editorial support from staff, I prefer
to not make any changes (even editorial ones) without committee discussion. I think your editorial notes are
very helpful. In terms of how best to submit these, may I suggest commenting on
the initial working group ballot. I noticed that your email did
not go to the reflector even though you copied it. In examining the reflector
it looks like it is working. Could you look at your mail settings? I would be
happy to work with you offline and/or look at our reflector configuration
again. Regards, Wael From: Grow, Bob
[mailto:bob.grow@xxxxxxxxx] Weil: If we have some editorial support for the merge, do we want to
attempt to include some editorial changes? I don’t know what we might
choose to do in advance of ballot, but I have notes on my copy of a few general
things to clean up.
Inter-Packet Gap 8 (various capitalization) interpacket gap 44 interpacket-gap 1 Major Capabilities/Options (various PICS title capitalizations)
A search shows 514 instances referencing 8802-3. With our
request to withdraw 8802-3, we need to fix this on this revision. Let me know if you would prefer maintenance change requests for
either of these, just want to discuss them during maintenance, or would rather
take them during WG ballot. --Bob From: Wael Diab
[mailto:wdiab@xxxxxxxxxxxx] Colleagues, The IEEE-SA Standards Board approved the PAR to revise IEEE
Std 802.3-2008. A new web-area for the project has been created: http://www.ieee802.org/3/bh/. A link to
the approved PAR along with other useful links and information can be found
there. Our Maintenance reflector will be used for this project. If
you are interested in this work, please subscribe to that reflector. A link to
subscribe can be found on the web-area. Regards, Wael -- Chair,
IEEE 802.3 Maintenance Task Force |