IEEE 802.3 January 2016 Interim Minutes
21 January, 2016
Atlanta, GA, USA
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group Interim, Atlanta, GA, 21 January, 2016
Administrative attachments
Attachment A1
IEEE 802.3 Interim agenda
Attachment A2
IEEE 802.3 Interim slides
Attachment A3
IEEE 802.3 Voting member list
Attachment A4
Working Group meeting attendance list
Attachment A5
IEEE 802.3 Attendance list Piscataway
Attachment A6
IEEE 802.3 Attendance list Atlanta
Liaison Attachments (External and Internal)
Attachment C1
ITU-T SG15 to IEEE 802.3 on timestamping point for multilane Ethernet interfaces
Attachment C2
ITU-T SG5 to IEEE 802.3 regarding new ITU Recommendations with Ethernet application testing
Attachment 1
(Password protected)
Attachment 2
(Password protected)
Attachment 3
(Password protected)
Attachment C3
OIF to IEEE P802.3bs regarding progress on OIF CEI-56G projects
Attachment 1
(Password protected)
Attachment 2
(Password protected)
Attachment C4
COBO to IEEE 802.3 on status and request for draft
Attachment C5
DRAFT liaison to ISO/IEC JTC 1/SC 6 on Availability of IEEE drafts
Attachment C6
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on 40GBASE-T Return Loss Requirements
Attachment C7
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on Cabling to Support 25GBASE-T
Attachment C8
DRAFT liaison to ITU-T SG15 on the P802.3bs 400 Gb/s Ethernet amendment
Attachment C9
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on ISO/IEC 29125
Attachment C10
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on plastic optical fiber
Attachment C11
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on guidelines to support 2.5GBASE-T and 5GBASE-T
Attachment C12
Liaison to ISO/IEC JTC 1/SC 6 on Availability of IEEE drafts
Attachment C13
Liaison response to ISO/IEC JTC1/SC25 WG3 on 40GBASE-T Return Loss Requirements
Attachment C14
Liaison response to ISO/IEC JTC1/SC25 WG3 on Cabling to Support 25GBASE-T
Attachment C15
Liaison to ITU-T SG15 on the P802.3bs 400 Gb/s Ethernet amendment
Attachment C16
Liaison response to ISO/IEC JTC1/SC25 WG3 on ISO/IEC 29125
Attachment C17
Liaison response to ISO/IEC JTC1/SC25 WG3 on plastic optical fiber
Attachment C18
Liaison response to ISO/IEC JTC1/SC25 WG3 on guidelines to support 2.5GBASE-T and 5GBASE-T
Return to IEEE 802.3 Minutes page
Last Update: 18-Mar 2016