IEEE 802.3 January 2016 Interim Minutes

21 January, 2016
Atlanta, GA, USA





Minutes

Approved Minutes, IEEE 802.3 Ethernet Working Group Interim, Atlanta, GA, 21 January, 2016


Administrative attachments

Attachment A1
IEEE 802.3 Interim agenda

Attachment A2
IEEE 802.3 Interim slides

Attachment A3
IEEE 802.3 Voting member list

Attachment A4
Working Group meeting attendance list

Attachment A5
IEEE 802.3 Attendance list Piscataway

Attachment A6
IEEE 802.3 Attendance list Atlanta

Liaison Attachments (External and Internal)

Attachment C1
ITU-T SG15 to IEEE 802.3 on timestamping point for multilane Ethernet interfaces

Attachment C2

ITU-T SG5 to IEEE 802.3 regarding new ITU Recommendations with Ethernet application testing
Attachment 1 (Password protected)
Attachment 2 (Password protected)
Attachment 3 (Password protected)


Attachment C3

OIF to IEEE P802.3bs regarding progress on OIF CEI-56G projects
Attachment 1 (Password protected)
Attachment 2 (Password protected)


Attachment C4
COBO to IEEE 802.3 on status and request for draft

Attachment C5
DRAFT liaison to ISO/IEC JTC 1/SC 6 on Availability of IEEE drafts

Attachment C6
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on 40GBASE-T Return Loss Requirements

Attachment C7
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on Cabling to Support 25GBASE-T

Attachment C8
DRAFT liaison to ITU-T SG15 on the P802.3bs 400 Gb/s Ethernet amendment

Attachment C9
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on ISO/IEC 29125

Attachment C10
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on plastic optical fiber

Attachment C11
DRAFT liaison response to ISO/IEC JTC1/SC25 WG3 on guidelines to support 2.5GBASE-T and 5GBASE-T

Attachment C12
Liaison to ISO/IEC JTC 1/SC 6 on Availability of IEEE drafts

Attachment C13
Liaison response to ISO/IEC JTC1/SC25 WG3 on 40GBASE-T Return Loss Requirements

Attachment C14
Liaison response to ISO/IEC JTC1/SC25 WG3 on Cabling to Support 25GBASE-T

Attachment C15
Liaison to ITU-T SG15 on the P802.3bs 400 Gb/s Ethernet amendment

Attachment C16
Liaison response to ISO/IEC JTC1/SC25 WG3 on ISO/IEC 29125

Attachment C17
Liaison response to ISO/IEC JTC1/SC25 WG3 on plastic optical fiber

Attachment C18
Liaison response to ISO/IEC JTC1/SC25 WG3 on guidelines to support 2.5GBASE-T and 5GBASE-T


Return to IEEE 802.3 Minutes page
Last Update: 18-Mar 2016


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]