IEEE 802.3 January 2020 Interim Minutes
23 January, 2020
Geneva, CH
Minutes
Approved Minutes, IEEE 802.3 Ethernet Working Group Interim, Geneva, 23 January, 2020
Administrative attachments
Attachment A1
IEEE 802.3 Interim agenda
Attachment A2
IEEE 802.3 Interim slides
Attachment A3
IEEE 802.3 Voting member list
Attachment A4
IEEE 802.3 Membership list
Attachment A5
Working Group meeting attendance list
Attachment A6
IEEE 802.3 Attendance list Geneva
Attachment A7
IEEE 802.3 Future Meetings report
Task Force and Study Group attachments
Attachment B1
IEEE P802.3cu 100 Gb/s and 400 Gb/s over SMF at 100 Gb/s per Wavelength Task Force
Liaison Attachments (External and Internal)
Attachment C1
MEF to IEEE 802.3 regarding Operator Layer 1 Service Attributes and Services Working Draft
Attachment
(Password protected)
Attachment C2
Broadband Forum to IEEE 802.3 regarding adopting open structure
Attachment C3
OIF to IEEE 802.3 regarding progress on OIF CEI-112G-VSR and CEI-112G-LR projects
Attachment
(Password protected)
Attachment C4
Draft Liaison to ITU-T-SG15 on current status of HNT projects.
Attachment C5
Draft Liaison to ITU-T-SG15 on current status of P802.3ct Task Force.
Attachment C6
Draft Liaison to ITU-T-SG15 on current status of OTNT projects.
Attachment C7
Draft Liaison to ITU-T-SG15 regarding coordination between the IEEE P802.3cs Task Force and ITU-T Q2/SG15 project G.9807.3.
Attachment C8
Draft Liaison to ITU-T-SG15 regarding coordination of bidirectional optical for access.
Attachment C9
Draft Liaison to ITU-T-SG15 on current status of ANT projects.
Attachment C10
Draft Liaison to ITU-T-SG15 regarding the status of the IEEE P802.3ck project.
Attachment C11
Draft Liaison to ITU-T-SG15 regarding the status of the IEEE P802.3ck project.
Attachment C12
Liaison to ITU-T-SG15 on current status of HNT projects.
Attachment C13
Liaison to ITU-T-SG15 on current status of P802.3ct Task Force.
Attachment C14
Liaison to ITU-T-SG15 on current status of OTNT projects.
Attachment C15
Liaison to ITU-T-SG15 regarding coordination between the IEEE P802.3cs Task Force and ITU-T Q2/SG15 project G.9807.3.
Attachment C16
Liaison to ITU-T-SG15 regarding coordination of bidirectional optical for access.
Attachment C17
Liaison to ITU-T-SG15 on current status of ANT projects.
Attachment C18
Liaison to ITU-T-SG15 regarding the status of the IEEE P802.3ck project.
Attachment C19
Liaison to ITU-T-SG15 regarding the status of the IEEE P802.3ck project.
Return to IEEE 802.3 Minutes page
Last Update: 13 July 2020